550 likes | 557 Views
Follow the transformation of PWHS through milestones like building demolition, construction crane installation, academic pod development, and renovation of key areas like the PAC, fitness center, and more.
E N D
Prepping the Bluff 6-9-16
Construction Crane in Place 7-18-16
Academic Pod Foundation 8-25-16
Academic Pod Infrastructure 10-10-16
Academic Pod Exterior Steel Studs 10-20-16
Academic Pod Concrete Floor 10-28-16
View from Below 4-25-17
Demolition 7-25-17
Library Demolition 7-27-17
Preparing for the New Foundation 10-9-17
Pre-cast Gym Wall Installation 2-28-18
PWHS New Entrance 3-5-18
Gutted and Renovated Locker Room 3-29-18
Wrestling Room Sub Floor 4-10-18
Cafeteria Kitchen and Servory 8-15-18
Gym Floor Installation 9-13-18
Striping the Gym Floor 10-25-18
Front Entrance 11-6-18
Home Court Advantage 11-5-18
Cafeteria from Commons 11-13-18
PAC Seating 11-27-18
Upper Commons 11-16-18
Fitness Center Installation 12-12-18
Entrance to Commons 12-21-18