150 likes | 221 Views
Welcome to Presentation dated 13.12.2010. Sector wise supply. Source-wise availability. Expected domestic availability. Expected R-LNG availability. Sector wise Demand:. (mmscmd). Present pipeline infrastructure. Existing Pipeline. DHABOL 5 mmtpa. DAHEJ 5 mmtpa. HAZIRA 2.5 mmtpa.
E N D
Welcome to Presentation dated 13.12.2010
Sector wise Demand: (mmscmd)
Existing Pipeline DHABOL 5 mmtpa DAHEJ 5 mmtpa HAZIRA 2.5 mmtpa DELHI NEPAL BHUTAN AURAIYA LUCKNOW DHOLPUR JAGDISHPUR KANPUR GREP IBRAHIMPUR KELARAS SHILLONG MALANPUR KOTA PHOOLPUR BANGLADESH DVPL HVJ JAGOTI DEWAS PITHAMPUR BHARUCH SURAT DUPL EXISTING MAJOR PIPELINES HVJ PUNE GREP DVPL KAKINADA DVPL DUPL + DPPL GAIL REGIONAL NETWORL LNG Terminal KANJIRKKOD RGTIL
Upcoming Pipeline & LNG infrastructure: LUCKNOW AGARTALA CUTTACK BARODA DAMRA MUMBAI HYDERABAD CHENNAI TIRUCHCHIRAPALLI TUTICORIN NANGAL BHATINDA DELHI BAREILLY GURGAUN AURAIYA DISPUR MATHANIA AGRA JAGDISHPUR KANPUR PATNA GWALIOR PHOOLPUR KOTA JHANSI GAYA VARANASI VIJAYPUR UJJAIN BOKARO RAJKOT AHMEDABAD LNG KOLKATA SURAT Upcoming BHUBANESHWAR KRISHNAPATNAM Transmission Pipelines RAJAMUNDRY DABHOL 5 mmtpa SOLAPUR KAKINADA KOLHAPUR VIJAYAWADA GOA Pipeline authorized to GAIL NELLORE BHOPAL ENNORE 2.5 mmtpa BANGLORE Pipeline authorized to RGTIL HASAN MANGLORE KANJIKKOD COIMBTORE KOCHI 5 mmtpa 9
Additional pipeline after commissioning of new pipeline & up gradation of existing pipeline:
Pipeline & LNG infrastructure Present& Future DAHEJ I & II 10 mmtpa* HAZIRA 2.5 mmtpa LUCKNOW AGARTALA CUTTACK BHARUCH BARODA DAMRA PUNE MUMBAI HYDERABAD CHENNAI City Gas/ CNG Existing TIRUCHCHIRAPALLI Planned TUTICORIN LNG Terminal NANGAL BHATINDA DELHI BAREILLY GURGAUN AURAIYA DISPUR MATHANIA AGRA JAGDISHPUR KANPUR PATNA GWALIOR PHOOLPUR KOTA JHANSI GAYA VARANASI VIJAYPUR UJJAIN BOKARO RAJKOT AHMEDABAD LNG KOLKATA Existing SURAT Upcoming BHUBANESHWAR KRISHNAPATNAM Transmission Pipelines RAJAMUNDRY DABHOL 5 mmtpa SOLAPUR KAKINADA Existing Pipeline KOLHAPUR VIJAYAWADA GOA Pipeline authorized to GAIL NELLORE BHOPAL ENNORE 2.5 mmtpa BANGLORE Pipeline authorized to RGTIL HASAN MANGLORE KANJIKKOD COIMBTORE KOCHI 5 mmtpa
LNG Infrastructure Present & Future • PLL’s Dahej terminal has been expanded to 10 MMTPA last year. • The Hazira terminal of Shell with a capacity of 2.5 MMTPA is operational. • planned Kochi terminal of PLL with a capacity of 5 MMTPA is expected by 2011-12. • The 5 MMTPA Dabhol terminal is projected to be operational in 2011 without breakwater and fully after completion of breakwater. • IOCL is planning for 2.5 mmtpa ennore terminal in Tamil Nadu.
Demand & Supply analysis: (mmscmd) Large Potential for R-LNG/ imported gas in next three years
India Preferred Location for LNG: • Huge demand supply gap • Rapidly growing economy • Development New transpiration capacity almost doubling the present transportation capacity. • Potential for relatively flexible off-take • Emergence of new gas market • India import around 5.2% of total LNG traded in the world in 2009.