1 / 23

Regional Transportation Plan

Regional Transportation Plan. Draft Hybrid Scenario Transportation Policy Committee 7/22/03. Final Draft Stage of Regional Transportation Plan. Started with the July 16 th TPC 3 rd Draft Hybrid: No bus local match I-10 Reliever as interim with no connection to SR 85

rianne
Download Presentation

Regional Transportation Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Regional Transportation Plan Draft Hybrid Scenario Transportation Policy Committee 7/22/03

  2. Final Draft Stage of Regional Transportation Plan • Started with the July 16th TPC 3rd Draft Hybrid: • No bus local match • I-10 Reliever as interim with no connection to SR 85 • Sales tax balance of $129 million

  3. Proposed Hybrid Changes since July 16th. • TPC request to include I-10 Reliever as full freeway with interim facility between L303 and SR 85. • Transit program revisions • City of Phoenix proposal to fund I-17 improvements

  4. I-10 Reliever

  5. Revised Transit Program

  6. I-17 Funding Proposal

  7. Other identified highway needs

  8. Possible funding resources

  9. Funding by Major Mode

  10. Capital and Operations Funding

  11. Regional Shares Population Shares Funding Shares

  12. Per capita VMT by facility type and mode. Percent of trips on transit (mode split). Total transit ridership. Pollution emission index. Point-to-point travel times. Peak period speed by facility type. Number of intersections by level of service. Freeway and street miles by level of service. Peak period delay by facility type. Percent of transit dependent persons served Households within one-quarter mile of transit service. Percent of persons within 30 and 60 minutes of employment. Households within five miles of park-and-ride lots and transit centers. Jobs within one-quarter mile of transit service. Transportation Model Output – System Level

  13. Transportation Model Output – Link/Route Level • Freeway and street traffic volumes. • Transit route ridership. • Freeway and street peak period speeds. • Intersection level of service. • Freeway and street level of service.

  14. Next Steps • Approval of the Draft Final Stage of the RTP on July 22nd • Modeling of hybrid. • Develop implementation program • Plan refinements based on modeling and comments. • September adoption for air quality conformity.

  15. Regional Transportation Plan

  16. Index Gas & Diesel Index Gas Taxwith Inflation

  17. Index Gas Taxwith Inflation • Added revenues for ADOT • MAG’s share: 750 million • Rest of state: 950 million • Total: $1.7 billion • MAG Cities & County $940 million • Total for MAG Region$ 1.7 billion • Gas Tax Rates: • Current: 18 cents • 2025: 33 cents

  18. Index Gas and Diesel Taxwith Inflation • Added revenues for ADOT • MAG’s share: 1.1 billion • Rest of state: 1.3 billion • Total: $2.4 billion • MAG Cities & County $ 1.3 billion • Total for MAG Region $2.4 billion • Diesel Tax Rates: • Current: 26 cents • 2025: 47 cents

More Related