1 / 13

Draft Regional Transportation Plan 2007 Update

Draft Regional Transportation Plan 2007 Update. Public Hearing March 9, 2007. Previous RTP Updates. 2003 RTP - Major Plan Revision. - Approved Nov. 25, 2003. 2004 Update - LRT Schedule Changes. - Approved June 23, 2004. 2005 Update - Highway and Arterial Phasing Changes.

Download Presentation

Draft Regional Transportation Plan 2007 Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Draft Regional Transportation Plan 2007 Update Public Hearing March 9, 2007

  2. Previous RTP Updates • 2003 RTP - Major Plan Revision. - Approved Nov. 25, 2003. • 2004 Update - LRT Schedule Changes. - Approved June 23, 2004. • 2005 Update - Highway and Arterial Phasing Changes. - Approved July 27, 2005. • 2006 Update - Life Cycle Programs Added. - Approved July 26, 2006.

  3. 2007 RTP Update • Complies with SAFTEA-LU. • Updated Modal Life Cycle Programs. • Freeway/Highway Life Cycle Program. • Arterial Street Life Cycle Program. • Public Transit Life Cycle Program. • Cost/Revenue Outlook.

  4. Complies with SAFTEA-LU • Federal Safe, Accountable, Flexible, Efficient, Transportation Equity Act– A Legacy for Users (SAFETEA-LU). • Expanded Consultation. • Public Participation Plan. • Coordinated Human Services Transportation Plan. • Transportation Enhancements. • Extended Planning Outlook. • Congestion Management Process. • Performance Monitoring. • Transportation Security.

  5. Modal Life Cycle Programs • Regional Funding Sources

  6. Modal Life Cycle Programs • Regional Funding Distribution

  7. Freeway/Highway Life Cycle Program STAN PROJECTS: • I-10 (Verrado Way to Sarival Ave.) - General Purpose lanes: Advanced from 2023 to 2009. • I-17 (Anthem Rd. to Carefree Hwy.) - General Purpose Lanes: Advanced from 2024 to 2009. • Loop 101/Pima Fwy. (Tatum Blvd. to Princess Dr.) - HOV Lanes: Advanced from 2011 to 2008. • Loop 101/Price Fwy. (Baseline Rd. to 202/Santan Fwy.) - HOV Lanes: Advanced from 2010 to 2008. • Loop 303 (Bell Rd. T.I.) - Partial Interchange: Advanced from 2011/15 to 2008. • Loop 303 (Cactus Rd. and Waddell Rd.) - Bridge Structures: Advanced from 2011/15 to 2008. • SR 802/Williams Gateway Fwy. (202/Santan Fwy. to Meridian Rd.) - Major Right-of-Way Protection: Advanced from 2016/20 to 2007.

  8. Arterial Street Life Cycle Program PROJECTS: • McKellips Rd. (Gilbert Rd. to Power Rd.) - Scope changed from road widening to six intersection improvements. • Mesa Dr. (Southern Ave. to US 60) - Scope changed from one contiguous road improvement (Broadway Rd. to US 60) to a road improvement (Southern Ave. to US 60) and an intersection improvement (Broadway Rd.). • Southern Ave. (Country Club Dr. to Recker Rd.) - Scope changed from road widening to four intersection improvements. • Warner Rd. at Greenfield Rd. - Deleted from ALCP due to project eligibility requirements. The funding will remain and applied to another arterial project in Town of Gilbert. • Pima Rd.: (Dynamite Blvd. to Cave Creek Rd.) - North terminus changed from Cave Creek Rd. to Stage Coach Rd.

  9. Public Transit Life Cycle Program REGIONAL GRID ROUTES: • Grid Route Changes in service start dates. Advancements: -Dobson Rd.: FY 2011 to FY 2009. - Greenfield Rd.: FY 2024 to FY 2022. - Power Rd.: FY 2025 to FY 2010. - Southern Ave.: FY 2011 to FY 2009. Delays: - 59th Ave.: FY 2015 to FY 2020. - Arizona Ave./Country Club Dr.: FY 2010 to FY 2012. - Buckeye Rd.: FY 2020 to FY 2021. - Tatum Blvd./44th St.: FY 2016 to FY 2020. - Van Buren St.: FY 2016 to FY 2020. • Express/BRT Changes in service start dates. Delays: - Buckeye Express: FY 2011 to FY 2015. EXPRESS/BRT:

  10. Cost/Revenue Outlook • Costs Are Currently within Expected Revenues for All Life Cycle Programs. • Major Cost Issues Are Expected in the Future as Scoping, Design Concepts and Environmental Assessments are Completed.

  11. Cost/Revenue Outlook(Cont.) • Freeways/Highways Cost increases may have a substantial impact on the ability to deliver the freeway/highway program identified in the RTP within the originally anticipated schedule. • Arterial Streets Significant construction and right of way cost increases may result in some of the arterial street projects being reduced in scope or delayed, since the regional contributions to street projects are fixed and the ability of local jurisdictions to provide the increased funding may be limited. • Public Transit Given recent trends of escalating wages, fuel prices, and construction costs, over the long term pressure will increase to balance transit costs with available revenues.

  12. Next Steps • March – Conduct Mid-Phase Public Hearing. • April - Approve for Air Quality Analysis. • May – Perform Air Quality Conformity Analysis. • June – Conduct Final Phase Public Hearing. • July – Adopt 2007 Update.

  13. For more information contact: Roger Herzog 602-254-6300 rherzog@mag.maricopa.gov

More Related