R. Ostojic CERN, AT Department

Overview of the LHC Low-beta Triplets. R. Ostojic CERN, AT Department. LHC Insertions. Experimental insertions in points 1, 2, 5, 8 contain low-beta triplets. In total, eight triplets are installed. The LHC low- b triplet. D1. Q3. Q2. Q1. DFBX. TASB. LBX. DFBX. MQXA. MQXB. MQXB.

rimona
Download Presentation

R. Ostojic CERN, AT Department

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview of the LHC Low-beta Triplets R. Ostojic CERN, AT Department

  2. LHC Insertions Experimental insertions in points 1, 2, 5, 8 contain low-beta triplets. In total, eight triplets are installed.

  3. The LHC low-b triplet D1 Q3 Q2 Q1 DFBX TASB LBX DFBX MQXA MQXB MQXB MQXA 6.37 5.5 5.5 6.37 MCSOX MCBXA MQSX MCBX MCBX Triplets were designed and built by a collaboration of five laboratories: BNL, CERN, Fermilab, KEK, LBNL. IR 1 and 5, D1 is a normal conducting dipole.

  4. Design and manufacture • Magnets • MQXA (Q1, Q3) KEK • MQXB (Q2) Fermilab • Correctors CERN • MBX (D1) BNL • Cryostats • Q1, Q2, Q3 Fermilab • D1 BNL • DFBX LBNL, Fermilab • Interconnects Design • Q1-Q2, Q2-Q3, Q3-DFBX Fermilab • D1-DFBX BNL, Fermilab Execution CERN • Jacks and tunnel installation CERN

  5. Design specifications and documents • All design specifications and solutions are documented in the functional and interface specifications. These documents were released following collaboration meetings and independent reviews, and after a formal review procedure in the CERN EDMS. (EDMS documents: LHC-LQX-ES%, LHC-DFBX-ES%, LHC-MBX-ES%). • Acceptance procedures for all magnets and DFBX are defined in appropriate Acceptance Plans, also formally reviewed in CERN EDMS. (EDMS documents: LHC-LQX-TP%, LHC-DFBX-ES-0001, LHC-MBX-ES-0003). • Safety related procedures and documents were reviewed by competent bodies in participating laboratories following the Memoranda of Understanding. (http://sc-gs.web.cern.ch/sc-gs/gs_ms/TISUS/)

  6. Key dates • Design and development 1998-2002 • Production 2001-05 • Delivery at CERN 2003-07 • First triplet assembly at CERN April 2005 • First triplet in tunnel (8L) Dec 2005 • Triplet in 8L under vacuum June 2006 • Pressure test of Sector 7-8 (8L) Nov 2006 • Repair of HX in all triplets Feb-May 2007 • Pressure test of triplet in 5L Mar 2007

  7. Schematics of the mechanical design Internal heat exchanger FP Cold Mass-Vacuum Vessel Fixed Point HX-Cold Mass External heat exchanger (HX) D1 Q3 Q2B Q2A Q1 DFBX MQXA MQXB MQXB MQXB MQXA LBX Fixed Point Triplet-Tunnel Floor Tie Rods Linking Vacuum Vessels Jacks (longitudinal) 38490 For details see dwg. LHCLSX__0001 and LHCLSX__0003.

  8. LHC low-b triplet – Q2 External heat exchanger GRP spider MQXB quadrupoles

  9. LHC low-b triplet – Q1 End domes and cryo-piping assembled by Fermilab MQXA quadrupole

  10. LHC low-b triplet – D1 Internal heat exchanger MBX = RHIC dipole

  11. LHC low-b triplet – DFBX

  12. LHC low-b triplet – warm assembly

  13. Q1 - Q2 interconnect

  14. Q1 - Q2 interconnect

  15. Q1 - Q2 interconnect closure

  16. Q2 - Q3 interconnects – TAS B

  17. Q3 - DFBX

  18. DFBX - D1

  19. DFBX - D1