An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VALLEY LONGWALLDRILLING P/L • CURRENT PROJECTS: • Central Colliery • Southern Colliery • Grasstree Mine • North Goonyella Mine • Oaky Creek #1 • Oaky North Mine • Daning Mine - China

  2. Central , Southern & Grasstree • Our long term contracts are with Anglo Coal. • Grasstree project has been on hold for some months as expected, while the mining dept.moves equipment u/g to begin development drivage. • Southern running two shifts up until x-mas.

  3. North Goonyella • Methane drainage for the 4 Nth Longwall block. • We have a Mecca stuck at a depth of 380 meters with a recovery attempt to start next week.

  4. Oaky #1 & Oaky North • Current project is for gas drainage. • Setting up of the drill site commenced this week. • Project to run up until x-mass.

  5. Daning Mine • Operated by SAADEC (Shanxi Asian American Daning Energy Company). • Longwall mine with designed annual production of 4 million tones. • Mining seam is the no. #3 seam. • Total seam thickness 3 meters. • Permeability 2 milidarcy on average.

  6. Daning Mine • Modeling was done by the Taiyuan University of Technology on a neighboring mine, no modeling was done at Daning itself. • Flow readings are taken using a pizometer. • Coring from the surface is not an option due to mountainous terrain & Gov. permits.

  7. Daning Mine • Total gas output at the surface stack: • April 2003 – 72130 m3. (Before VLD rig on site) • June 2003 – 90676 m3. (After • August 2003 – 109357 m3. (After 26,000m. of long hole drilling). • Whole mine average concentration of pure methane 65.05%.

  8. Daning Mine • Total holes rotary drilled 260 average length 120 meters. • DHM & camera, 78 holes average length 232 meters. • AMT Mecca Surveyed holes 33, average length 872 meters.