1 / 15

FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Brainstorm on Mechanics. Hamburg 18/5/06. FP 420 Connection Cryostat Design Keith Potter, Shrikant Pattalwar, Benoit Florin, Thierry Renaglia, Thierry Colombet, Domenico Dattola. Connection Cryostat V4.

roana
Download Presentation

FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FP 420 Brainstorm on Mechanics. Hamburg 18/5/06 FP 420 Connection Cryostat Design Keith Potter, Shrikant Pattalwar, Benoit Florin, Thierry Renaglia, Thierry Colombet, Domenico Dattola

  2. Connection Cryostat V4. With respect to the previous version presented during the past meeting, the dimension of slots has been increased; only 2 slots of 4 m each one ,connected together by a passage of 500x 250 in the central region.

  3. Collecting all continuity line on top of beam pipe. (option 4) The liquid helium level necessary to keep the bus bars fully dipped is higher than the level in the dipole cryostat. The size of the thermal shield (50-80K) surrounding the above cold mass works out to be large and will come in the way of beam pipe. (dia ~ 420 mm)

  4. Move all on bottom side except line X (option 5) This option appears to be enough space for detector mounting, is confined within the boundaries of the existing interconnection cryostat and meets all the cryogenic requirement defined by the CERN design criteria.

  5. DFP Arc Termination Module (ATM) in LHC

  6. Distribution Feed Boxes (DFB) with ATM Internal layout

  7. ATM DFB interface I

  8. ATM DFB interface II

  9. ATM DFB interface III

  10. ATM Distribution Feed Boxes interface. IV

  11. Assembly Connection Cryostat ATM, B-Bar lines, line X

  12. Tunnel layout

  13. X line position I X line does not exist on the current Arc Termination Module. Adding this line on the existing ATM design seems not problematic. Keeping this line on the same position as on magnets, detector accessibility is limited from top side.

  14. Xline pos II This option allow a good detector accessibility.

  15. Next steps(technical) • There are many technical issues to be resolved, some major once are listed below… • Whether the system can be designed in 3-4 different parts (the two ends and the middle section) and assembled in the tunnel during installation or should be assembled as a single 12 m large unit in line with the existing assembly process. • In either of the cases a support structure needs to be worked out. • ( A single large module is preferred) • Whether the detectors will be mounted independently of the cryostat or the cryostat will have to provide the necessary support. • How to provide the ‘cold’ to the thermal shields surrounding the line X in the upper region. We will have to design some interconnections in the end sections to achieve this. • Defining the material of various components of the new design…

More Related