An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Arming and Re-arming Etienne CARLIERAB/BT/EC

  2. Outline • Readiness • LBDS • Kicker • Arming… Re-arming • General • Sequencing • TSU

  3. LBDS Readiness Ready State State Transition

  4. LBDS Check

  5. Dump Action

  6. Kicker System Readiness

  7. Kicker State

  8. State Control & SurveillanceHierarchy Generator control level Stage detailed interlock Extraction Kicker Summary LBDS Kicker Summary

  9. LBDS ArmingGeneral • Re-arm/check individually each subsystems. TSU re-arming will ne possible only once all subsystems are READY • Re-arm BETS: will be READY if real-time tracking is in RECORDING • Re-arm IPOC:will be READY if FAAS is in ACQUIRING state • Re-arm KICKER (MKD & MKB): will be READY if • All generators are ON • Feedback Tracking stage is OK • Internal post operational check stage is OK • Check LASS: will be READY if machine is closed (no re-arm) • Check Re-trigger: will be READY if both re-trigger lines are closed and connection to TSU OK (no re-arm) • Re-arm and Lock TSU • All TSU inputs OK • Locked on revolution frequency

  10. LBDS ArmingSequencing 1. Individual sub-systems re-arming 2. Set Injection Permit to FALSE 3. Mask LBDS Ready to TRUE for 500ms 4. Wait for Beam Permit TRUE from BIS 5. Re-arm & lock TSU 6. Release LBDS Ready Mask 7. Set Injection Permit to TRUE

  11. TSU ArmingFlowchart