API 6A718 Work Group on Addition of Nickel Base CRAs

API 6A718 Work Group on Addition of Nickel Base CRAs. API SC6 Summer 2012 Meeting Paul Maxwell. Objective.

Download Presentation

API 6A718 Work Group on Addition of Nickel Base CRAs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. API 6A718 Work Group on Addition of Nickel Base CRAs API SC6 Summer 2012 Meeting Paul Maxwell

  2. Objective • Provide requirements for Age Hardened Nickel Base alloys used in the manufacture of API 6A pressure-containing and pressure-controlling components to assure they are not embrittled by the presence of an excessive level of deleterious phases and meet minimum metallurgical quality requirements. • These additional requirements include detailed process control requirements and detailed testing requirements.

  3. Participants

  4. Meetings • September 27, 2011 • November 29, 2011 • April 18, 2012

  5. Progress Definition of Scope and Purpose Chemical Compositions Manufacturing Requirements Heat Treatment Procedures Hardness Requirements

  6. To Be Done • Finalize Mechanical Property Requirements • Test Orientation • Properties for Sizes >10 in. • Develop an Appropriate Hardness Conversion Table • Develop Hardness Re-Test Procedure • Develop Grain Size & Microstructure Requirements including Photomicrographs • Determine Whether Additional Testing will be Required to Validate Requirements

  7. Next Meeting Anticipated to be in AugustGoal to Ready for Ballot January 2013