1 / 14

Delta P Systems, Inc. Project Presentation Gallery

Delta P Systems, Inc. Project Presentation Gallery. Delta P Systems, Inc. Holly Hill, FL www.deltapsystems.com 1-800-508-4218. The show will advance automatically. Marriott Hotel – Ft. Collins, CO. PROBLEM:

rock
Download Presentation

Delta P Systems, Inc. Project Presentation Gallery

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Delta P Systems, Inc. Project Presentation Gallery Delta P Systems, Inc. Holly Hill, FL www.deltapsystems.com 1-800-508-4218 The show will advance automatically

  2. Marriott Hotel – Ft. Collins, CO PROBLEM: Pulsating pressure and poor system performance caused by sluggish system response to an on-site laundry facility, began to “put a wrinkle” in Marriott’s “neatly pressed” image. The hotel needed precise, rapid system pressure control.

  3. Marriott Hotel – Ft. Collins, CO Solution: The constant pressure system manufactured by a large system manufacturer was replaced with a Duplex Delta Pak ES system utilizing highly accurate variable speed pressure controls with PID loop. Removal of pressure restriction between system and laundry further stabilized pressure fluctuations, effectively eliminating them. Westward Ho!

  4. City of Apopka, FL PROBLEM: Conventional frame-mounted end suction re-claimed wastewater irrigation system installed in 1990 failed after less than 10 year service life. Private golf course is beginning to see the damage of irrigation woes.

  5. City of Apopka, FL Solution: Triplex Quiet Flow with stainless steel submersible turbine pumps and stainless steel, “easy-out” removal rack reduces floor space and increases serviceability and system reliability. Golf course and City are now “on top of their game.”!

  6. University of South Florida – Tampa, FL PROBLEM: Increased development throughout campus drops suction pressure at many buildings causing further plumbing anomalies. USF must find a system with no floor space requirements since there is no room in the building. Students can’t be bothered by system noise since system will be mounted just outside of a classroom. Photo courtesy of Bentzel Mechanical, Inc.

  7. University of South Florida – Tampa, FL Solution: Simplex Delta Pak Quiet Flow with stainless steel submersible turbine pumps and stainless steel, full line-size by-pass and check valve. Quiet as a mouse! (Even during pop quizzes) Photos courtesy of Bentzel Mechanical, Inc.

  8. Trammell Crow Properties PROBLEM: Rapid development of office park reduced municipal suction pressure available to the building tenants. Unfortunately, when building was constructed, there was no mechanical room space allocated for a booster system.

  9. Trammell Crow Properties Solution: Duplex Quiet Flow system with stainless steel pumps and full line-size, stainless steel by-pass and check valve installed just outside the building. A few small shrubs are all that is needed to conceal the system. No room? No Problem with Delta P Systems, Inc.

  10. Adam’s Mark HotelDaytona Beach, FL PROBLEM: Adam’s Mark Hotel chain is seeking cost effective and reliable solutions for their domestic water needs. They approach Delta P Systems for a package solution at their Daytona Beach, FL facility.

  11. Adam’s Mark HotelDaytona Beach, FL Solution: Delta P System proposes and builds a Triplex variable speed package for the multi-story, beachside resort. Adam’s Mark benefits from significant power savings over constant pressure systems. Over-pressurization is never a concern with our “reverse-logic” frequency drive control. Dude, get your Surf Board!

  12. Harrah’s Casino – Cherokee, NC PROBLEM: Reduction in service pressure from local municipal jurisdiction could mean that high rollers might have a “dry-spell” in their rooms on the top floor. Furthermore, the recently completed casino must fit a booster within a 20” wide space envelope!

  13. Harrah’s Casino – Cherokee, NC Solution: Quiet Flow vertical system was installed with an adjacent mount control panel in order to comply with NEC Requirements for service space. System capacity is 660 GPM at 180’ TDH (78 PSI) with (2) 20 H.P. stainless steel turbine pumps. JACKPOT!

  14. Thank You for watching! Can We Help You? Delta P Systems, Inc. would like to assist you. If you have any particularly complex applications, or you just need help with standard system sizing, please let us know. We are happy to assist in any way possible. Please call us if you are looking for one of our local representatives. Don’t forget to ask us how you can double your customers’ warranty to 2-Years! www.deltapsystems.com 1-800-508-4218

More Related