From Planning to Execution - The Critical Role of Heavy Haulage in Construction

This article will guide you to have an idea about the process of planning and execution of heavy haulage practices that play a critical role in construction projects.<br><br>

Download Presentation

From Planning to Execution - The Critical Role of Heavy Haulage in Construction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. From Planning to Execution: The Critical Role of Heavy Haulage in Construction The work process of a construction sector company is based on the use of heavy haulage. The users here want to move their constructional project- related goods safely to the given location on time. Heavy haulage services work to carry goods such as various oversized materials, machines, and many other components. The haulers also work to move the large-scale cranes and different kinds of structural and Pre-assembled elements that are needed. For better service for logistics in construction, there is a need for proper planning and coordination with the stakeholders. This article will guide you to have an idea about the process of planning and execution of heavy haulage practices that play a critical role in construction projects. Let’s know the role of transportation andhaulage services into a successful construction operation.

  2. Role Of Heavy Haulage In Construction Projects In The UK The size of the UK construction market was calculated as $386 billion in the year 2023. Nearly 2.8 million people have got their jobs in this industry. The construction machines market has the target to have 65,010 units of machines by the end of the year 2029. The haulage industry plays a major role in the growth of moving these machines. Needs for relocating the heavy machines: The heavy haulage services work for relocating construction goods like screwdrivers, trowels, clamps, hammers, shovels, etc. Moving the oversized machines: Machines like heavy excavators, backhoes, draglines, bulldozers, graders, etc come into the movement of various equipment of construction haulage. Supporting the industry in their mega-projects: The construction haulage practices work for managing the mega-projects of this sector. The transporters work to move different kinds of materials, heavy-weight appliances, etc, giving timely delivery and reducing any unwanted delays. Managing the site preparation: Haulage services also work for having cost-effective preparations for the construction sites. The haulers work for grading, clearing, testing of soil, and managing the systems of drainage.

  3. Carrying the hazardous goods: The freight transport services or construction haulage practices also work for carrying those goods that are hazardous. For this, they manage to follow various safety protocols to block various spills, leaks or accidents or any other kinds of damage to the environment. Key Takeaways The UK market of freight transport and construction haulage will have a progression of a CAGR of 2.80% within the time-frame of 2024 to 203o. The size of the market of this industry has been calculated as $69.23 billion in 2024 and it can rise to $81.69 billion in 2030. The construction haulage industry is also affected by the e-commerce industry. Heavy Haulage Goals For Construction Projects The people who work for transportation of heavy loads can carry goods that will be 44,000 kg heavy with a width of 2.9 metres and will be 18.65 metres long.

  4. Goal 1:Optimal planning of routes The construction haulage practices work with real-time trackers and systems to have optimal planning of routes. They work on proper time management and schedules for giving deliveries on your doorsteps as decided. If needed, they can work on changing the whole plan of the routes. Goal 2:Receiving the licences and permits There is a need to have the proper licence and permit for using different vehicles of construction haulage. The licence is needed to carry goods that have 1,525 kg or 3.5 tonnes of weight or more than that. Goal 3: Loading and unloading The process of loading and unloading is done while caring for pedestrians, overhead cables, and traffic. The process should be flat, unwavering, and free from any kind of hollow. Goal 4: Adoption of modern technologies Haulers should work with the process of real-time data or AI. These technologies are very much supportive for better planning and execution of routes. They make plans based on the condition of the vehicles, the capabilities of the drivers, and structure of the road.

  5. Goal 5: Providing safety and quality If you want to have a safe and best quality construction haulage service you need to make the routes familiar to the drivers, use blocking chains or locks for the safety of the goods, use devices for safety, and adhere to all safety- related policies made by the government. Goal 6:Protecting the goods and cargo The goods should be protected from any kind of hazard or damage. For this, they should be packed and placed well. You can work on inner packaging and the modern methods of sealing into heavy haulage. Goal 7: Enhancing the trust of the users If you want to give better service as a hauler for construction haulage you need to win the trust of the customers. For this, you need to work on sharing the feedback of the customers, having more transparency of work and you should be able to promote transparency and authenticity at work. You also have to manage various loyalty programmes or the satisfaction of the customers.

  6. Goal 8: Reducing the co2 emissions and other pollutants The use of trucks or other old vehicles in haulage services results in the co2 emissions for the environment. Thus, for the best practices you should use renewable energy sources in the trucks, and make the drivers prepared for the practices of the Eco-driving process. Goal 9: Having the best communication with the stakeholders In addition, you also manage to have the best quality of communication with all the stakeholders as a hauler or a transporter for a reliable heavy haulage. You can give constant updates about the progress of the vehicles. These steps will work for the smooth and reliable development of the heavy haulage projects and construction works. How To Have Optimal Route Preparation You have to be prepared with the best quality and safe routes. For this, you can work on route optimization software. This will work on more efficient planning of routes and will give better results with better management of time for construction haulage practices. These kinds of software can be like Route4Me.

  7. Checking the mode of transport: For having the best planning of routes you should cheque the mode of transportation like railroad, marine etc. The modes for construction haulage will be decided by the means of location and the distance to reach there as per the budget and cost. Quality of goods: You also need to cheque the condition of the goods inside the container, the process of its packaging, and the labels with proper verification of all documents and records. Arranging expert drivers: The haulers should be concerned for safety, they should have proper experience of work and they should be properly trained. Checking cost of fuel: The cost of the fuel used in the vehicle of construction haulage also matters. This is also affected by the management of the inventory. The fuel price can be different depending on the different kinds of fuel like gasoline, propane, distillate fuel, jet fuel, etc. Managing wear and tear: The wear and tear should be checked based on the results of expert verification. The hauler should also cheque properly the condition of the fuel and engine. Checking for emergency routes: For having the best construction haulage practises the hauler should know about the emergency routes and have practice to go through the routes.

  8. Executing Better Plans For Heavy Haulage The government of the UK has announced some of the policies regarding the use of fuel for the people in construction haulage services. It has been said that the new forms of vans and cars that run on petrol and diesel will not be sold from the year 2030. The government also has invested money in the progress of SRIs or strategic rail freight interchanges. Managing different networks of freight: The industry of construction haulage also has planned to implement a freight management system. This will work on connecting the key stakeholders from the operations of freight services. The stakeholders can be the forwarders, the shippers, carriers, and customers. Working on continuous professional development: The drivers should have the CPC or the certificate for professional competence. They should also work on managing the fleet and ensuring the health and safety of the drivers. Having updates on current regulations: The drivers should work on the regulations of the road vehicles of 1996 that are meant to be used in the applications of the constructions. They should also follow the act of 1992 for the health and well-being of the people working on construction sites. Record keeping: There is also a need to keep track of all the activities of the construction haulage practices by record keeping. The drivers should

  9. keep a record of their work timing. They should work for at least 9 hours a day. Heavy haulage and green initiatives: The haulers should work on implementing green initiatives that will lead to less release of CO2 emissions. They should also work on alternative fuels and adopt various recycling processes for energy usage. Focus on talent and training: The drivers for heavy haulage who will drive the cars and trucks should be well-trained and should be aware of how to manage sudden changes in weather. Focus on resilience and managing the risk of accidents: You should cheque and recognize what is the risk associated with construction haulage and how and whom it can harm. You should then work on managing and reducing the risk as per the records of the results and findings.

  10. The Bottom Line In the different operations of the construction sector, there is a need for well-managed transport and haulage services. You should cheque that your construction goods are being transported safely from one place to another. For this, you need to have proper planning of the routes and you should train the drivers. The drivers and other service providers should be aware of the current changes in the policies. Additionally, you should work on managing the 5Rs of the risk like recovery, rescue, reconstruction, reentry, and rehabilitation. Also, work on using current technologies for managing the haulage operations. Source URL - https://medium.com/@rockleytransport/from-planning-to- execution-the-critical-role-of-heavy-haulage-in-construction-fb892f7e08e2