An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISO TC64/SC4/WG2May 2011 status

  2. ISO TC67/SC4/WG2 Documents • CD 22830 Drilling and production equipment – Control systems for drilling well control equipment and diverter systems (API Spec 16D) • Current status: • - Project leader has given up (confused between his roles in API and ISO) • - Document back to Stage 0.0, waiting on API 16D revision (ballot expected Q1 2012) to go for a fast track adoption • - 16D chairman (Brian Wright) has accepted to become ISO PL for the fast track adoption phase

  3. ISO TC67/SC4/WG2 Documents • ISO 13354: Drilling and production equipment – Shallow gas diverter equipment • Current status: • - NWIP (N417) vote closed on 2009-04-30 • - Meeting held March 2010 in Houston to boost the project • - Project leader resigned in Feb. 2011… No work done • - Tried w/o success to find assistance among nominated experts • - WG2 convenor wrote and completed the draft by end of March 2011, then sent to experts for comments • - CD should hopefully be sent to SC4 secretary by end of June 2011 for CD ballot

  4. ISO TC67/SC4/WG2 Documents • TS 16339: Drilling and production equipment - Well control equipment for HP/HT drilling operations • Current status: • - Project launched as NWIP N460 on 2010-03-11 • - Voting closed on 2010-06-11 • - Draft completed and sent to experts for comments by end of April 2011

  5. Future projects to be launched (2011/2012) • BOP and associated equipment repair and remanufacturing Current status: - No Project Leader available • Blowout prevention equipment systems for well servicing activities Current status: - NWIP to be launched in 2011

  6. TC67 AHG - post MONTARA & MACONDO