An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Thailand Core Country Team:

  2. Cost-Benefit Analysis: Water Project • Project Name: The Phitsanulok Left Irrigation System Project, Phase II • Funding Source: Royal Thai Government • Project Leader: Royal Irrigation Dept., Ministry of Agriculture & Agriculture Cooperatives • Project Status: Completed feasibility study in 2010 • Total project investment:  323 million $ US • Project Objectives: • Outputs:(1) Irrigation canals; (2) Drainage systems; (3) Dikes along Nan River • Expected Outcomes: (1) Increase irrigation area and cropping frequency; (2) Provide water supply, (3) Protect and mitigate flood UNDP-USAID Capacity Building on ECCA: Thailand Case

  3. Cost-Benefit Analysis: Water Project Wetter Future Scenario UNDP-USAID Capacity Building on ECCA: Thailand Case

  4. Cost-Benefit Analysis: Water Project Wetter Future Scenario UNDP-USAID Capacity Building on ECCA: Thailand Case

  5. Cost-Benefit Analysis: Water Project What next? • Consult with climate scientists • Identify most likely climate scenario in the next 30 – 60 yrs at the project sites • Consult with water resource engineers • Identify proper alternatives for CC adaptation • Get estimates of the costs of those alternatives UNDP-USAID Capacity Building on ECCA: Thailand Case

  6. Cost-Benefit Analysis in Agriculture The economic cost-benefit analysis of alternative rice growing technique

  7. Cost-Benefit Analysis: Agriculture Project • Title: The economic cost-benefit analysis of alternative rice growing technique • Objective: • To evaluate the cost and benefit of alternative of rice growing technique at the farm level • Geographic scope of the project: • Irrigated area in central region • Actions on the ground/Alternatives: • Broadcasting • Manual parachuting • Rice transplanters UNDP-USAID Capacity Building on ECCA: Thailand Case

  8. Parachuting vs Rice Transplanter UNDP-USAID Capacity Building on ECCA: Thailand Case

  9. Cost-Benefit UNDP-USAID Capacity Building on ECCA: Thailand Case

  10. Next Step • To explore possible government supporting measures • Low interest loan for buying transplanting machine • Buying transplanting machine for community UNDP-USAID Capacity Building on ECCA: Thailand Case