1 / 8

Passed C9010-251 with Testpassport Questions

What is the best way to pass IBM C9010-251 exam? Testpassport C9010-251 real questions are your best choice.

Download Presentation

Passed C9010-251 with Testpassport Questions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. https://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asphttps://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asp C9010-251 Exam Questions Full version: 179 Share IBM C9010-251 Exam Questions 1.An AIX customer wants to be sure they can update their SAN multipath drivers with a minimal amount of time and impact on LPARs, while still being able to perform Live Partition Mobility operations. Which disk connectivity technology supports these requirements? A. vSCSI B. NPIV C. iSCSI D. SAS Answer: B 2.A customer is considering a purchase of an S812L. One PCIe Gen3 I/O Expansion Drawer is required to meet the I/O adapter requirements. How many rack units (EIA) are required? A. 7 B. 8 C. 4 D. 6 Answer: D 3.A customer wants to virtualize their storage environment and would like to use NPIV. Where will storage multipathing take place? A. Client LPAR B. VIOS LPAR C. vSCSI LPAR D. NFS LPAR Answer: A 4.A technical specialist will be tasked to add partitions to an existing server. Which browser-based tool will vid the configuration design to ensure that the requirements are within maximum server resources? A. Energy Estimator B. Econfig C. System Planning Tool D. Workload Estimator Answer: C page 1 / 8

  2. https://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asphttps://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asp 5.Which offering analyzes data-in-motion, delivers very high data rates, and exploits the bandwidth of POWER8? A. IBM SPSS Statistics B. IBM Informix C. IBM Infosphere BigInsights D. IBM Infosphere Streams Answer: D 6.A customer wants to save licensing costs. The following VMs are to be consolidated: - VM1 will run IBM i with 1 CPU - VM2 will run AIX i with 1 CPU - VM3 will run AIX i with 1.5 CPU - VM4 will run Linux with 1 CPU Which of the following will provide the consolidation at the least cost? A. S812 with 8 CPU B. S824 with 8 CPU C. S822 with 8 CPU D. S812L with 8 CPU Answer: C 7.A client want to move LPARs between servers to eliminate planned downtime. Which product provides this capability? A. PowerVM Standard Edition B. PowerVC Enterprise Edition C. PowerVP Standard Edition D. PowerVM Enterprise Edition Answer: D 8.Which virtualization management solution will slow a customer to apply some firmware updates without disrupting production partitions? A. HMC B. PowerVP C. IVM D. Kimchi Answer: A 9.What standard feature was added to the 4-core POWER8 S814 to improve the RAS capability when compared to a 4-core POWER7 720? A. Alternate Processor Recovery B. Chipkill Memory C. PCIe Hot Plug Support D. RAID 0 Answer: C 10.What is a benefit provided by the implementation of Shared Storage Pools as a disk storage page 2 / 8

  3. https://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asphttps://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asp solution? A. Provides the capability to rapidly provision new storage LUNs to virtual clients. B. Reduces the storage management tasks performed by the server system administrator. C. Minimizes the role of the VIO Server aid uses it only as a pass though for virtual disk adapters. D. Reduces the memory requirement in the VIO Server. Answer: C 11.Which LC server is delivered with four available (unoccupied) CAPI-enabled slots? A. S822LC Commercial B. S812LC Cloud C. S812LC Cluster D. S822LC High Performance Computing (HPC) Answer: A 12.A client purchased one Power S822 server to run their AIX workloads in virtual partitions. They intend to consolidate their Linux workloads to this POWER8 server in the future as well. Which virtualization solution will satisfy this requirement on this server? A. PowerKVM for both AIX and Linux workloads B. PowerVM for both AIX and Linux workloads C. OPAL for both AIX and Linux workloads D. KVM for both AIX and Linux workloads Answer: B 13.In the event of a disaster, a customer wants to automatically failover their Power System nodes that are running AIX. The customer will locate the servers in two data centers. Which IBM product will satisfy the customer¡¯s requirement? A. PowerHA SystemMirror Enterprise Edition B. IBM Metro Mirror C. Geographic Logical Volume Manager D. IBM Spectrum Scale (GPFS) Answer: A 14.What component of PowerKVM provides I/O virtualization? A. virsh B. QEMU C. Kimchi D. IPMI Answer: B 15.What is an advantage of sing SR-IOV as compared to using a SEA (Shred Ethernet Adapter) through VIOS? A. It requires little bandwidth per virtual adapter. B. It allows for direct access I/O. C. It enables LPM. D. It provides port security. page 3 / 8

  4. https://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asphttps://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asp Answer: B 16.Which S822 storage feature is required for Easy Tier? A. Eight SFF-3 bays I six 1 .8-inch SSD bays with Du IOA B. Twelve SFF-3 bays with split backplane (6+6) with second integrated SAS controller C. EXP24S SAS HOD/SSD Expansion Drawer with dual IOA D. Twelve SFF-3 bays with one integrated SAS controller Answer: C 17.A customer wants to purchase a server for Hadoop solution with the lowest TCA. Which of the following provides the lowest TCA for the requirement? A. S822LC B. S812LC C. S812L D. S822L Answer: B 18.A customer wards to provide redundant links to their network ports to increase network bandwidth and availability. This technique is referred to as: A. VLAN tagging. B. Network Interface Backup. C. Link aggregation D. Shared Ethernet Adapter. Answer: C 19.What is the maximum number of PCIe I/O slots available with one PCIe Gen3 /O Expansion Drawer? A. Four with one fanout module B. Seven with one fanout module C. Twelve with two fanout modules D. Fourteen with two fanout modules Answer: C 20.Which of the following is a standard feature of all Scale-out LC configuration? A. 64 GB of Memory B. One 1 TB SATA Disk Drive C. One 4-port 1Gb Ethernet Adapter D. Two Power Supplies Answer: D 21.A customer would like a development Power S824L running PowerVM for tree three Linux partitions. Each partition needs redundant LAN and SAN adapters. Which solution supports the minimum requirement? A. Two 146GB disk drivers Two 4-port LAN adapters page 4 / 8

  5. https://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asphttps://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asp Two 4-port SAN adapters, One VIO Server B. Two 146GB disk drives Two 4-port LAN adapters Two 4-port SAN adapters C. Six 146GB disk drives Six 4-port LAN adapters Six 4-port SAN adapters D. Four 146GB disk drives Four 4-port LAN adapters Four 4-port SAN adapters Two VIO Servers Answer: A 22.What is a benefit of IBM POWER8 support for little-endian (LE)? A. Ability to run programs compiled for x86 processors B. Support of older 32-bit applications C. Little-endian has better performance than Big-endian D. Ease of porting programs from other architectures Answer: A 23.Which of the following are required in order to utilize Live Partition Mobility? A. PowerVM Enterprise Edition SAN attached disk Virtual Ethernet B. Dedicated processors PowerVM Enterprise Edition Virtual Ethernet C. Dedicated processors Dual VIO Servers SAN attached disk Virtual Ethernet D. Dual VIO Servers PowerVM Enterprise Edition SAN attached disk Two virtual processors Answer: A 24.An IBM Power S824 server has Update Access Key valid through 01-01-2017. Which is a valid statement regarding firmware updates? A. Firmware updates will be restricted to IBM after 01-01-2017. B. Firmware Updates e orgy available le via the AS MIL and not the HMC after 01-01-2017 C. Firmware updates released prior to 01-01-2017 d be allowed, but those released after that date will not D. Firmware updates will not be restricted, but the server will display a message stating there is no maintenance contract in place. page 5 / 8

  6. https://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asphttps://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asp Answer: C 25.A customer wants to save on IBM i licensing costs: - They have three configurable processors and one IBM i license. - LPAR1 is running IBM i with .5 CPU. - LPAR2 is running IBM i with .5 CPU. - LPAR3 is running IBM i with .5 CPU. - All of the LPARs are uncapped. - They want to limit the IBM I LPARs to using one core. How can the customer enforce the limit and saver on their IBM i licensing costs? A. Change the AIX partition to have .5 CPU entitlement. B. Put the AIX LPAR in a shared processor pool with one core. C. Set the entitlement of each IBM I LPAR to ¡°one.¡± D. Put the IBM I LPARs in a shared processor pool with one core. Answer: D 26.A customer hosts multiple partitions on a POWER7 750 server and want to replace it with an S824 Scale-out server. The man concern is the high utilization of the 10Gbps Host Ethernet adapter ports. They want to maintain quality of service aid reduce CPU overhead while utilizing the minimum number of adapters. Which of the following physics adapter options can be added to satisfy the customer¡¯s concern with the proposed architecture? A. 10Gbps SR-IOV Ethernet adapter B. 10Gbps Ethernet adapter to each partition C. lntegrated 1whial Ethernet (IVE) 10Gbps Ethernet adapter D. 10Gbps Ethernet adapter m the VIO Server Answer: A 27.A customer has 20 partitions on a POWER8 system and would like to additional storage from their non-IBM SAN to eh of the partitions. The cost of the licenses for the drivers and multipath for all the partitions is higher than the current budget limits. Which of the following technologies will help with reducing the driver and multipath software licensing requirement? A. SAS B. NPIV C. SSD D. vSCSI Answer: D 28.What is the main function of the POWER8 CAPI feature? A. It improves memory bandwidth B. It connects auxiliary processors such as FPGAs. C. It increases the clock frequency speed. D. It improves cache coherency. Answer: B page 6 / 8

  7. https://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asphttps://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asp 29.What wodd a customer need to test the Active Memory Expansion feature? A. A trial AME code from the CoD website B. PowerVM Enterprise C. A temporary key frorn the IBM Key Center D. PowerVM Standard Answer: A 30.A customer wants to build a two-node active-active cluster of two 4-core AIX LPARs. The two nodes of the Cluster e connected to a SAN at the same location. What is the total number of licenses that are required for this configuration? A. PowerHA Standard Edition ¨C eight licenses B. PowerHA Enterprise Edition ¨C four licenses C. PowerHA Standard Edition ¨C five licenses D. PowerHA Standard Edition ¨C four licenses Answer: A Enjoy Discount on C9010-251 Full Version page 7 / 8

  8. https://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asphttps://www.testpassport.com/IBM-Certified-Technical-Sales-Specialist/C9010-251.asp Use coupon code testpassport to enjoy 25% discount on all Testpassport products, such as Huawei, IBM, Microsoft, and others. page 8 / 8 Powered by TCPDF (www.tcpdf.org)

More Related