60 likes | 92 Views
If you are looking for IBM C9010-262 Questions Answers then AuthenticDumps Provide you Real IBM Certified Technical Sales Specialist - Power Systems with POWER8 Enterprise V2 C9010-262 dumps PDF verified by IBM Specialist. The IBM C9010-262 Questions Answers PDF is a recommended by to pass C9010-262 exam in first attempt. You can easily pass your C9010-262 exam without wasting your time and money.<br><br>Get 20% discount by using this coupon code “Save20â€. If you Have any Question Our experts will help you 24x7 visit us today and get simply download IBM C9010-262 sample questions latest C9010-262 Dumps PDF:<br><br>https://authenticdumps.com/dumps/c9010-262/
E N D
IBM IBM Certified Technical Sales Specialist - Power Systems with POWER8 Enterprise V2 C9010-262 Exam QUESTIONS & ANSWERS (FREE - DEMO VERSION) Download Now Updated C9010-262 Exam PFD Demo Buy Full Product Here https://authenticdumps.com/dumps/c9010-262/
Version: 9.0 Question 1 A customer has ordered an E870. The system has been built, but cannot be shipped What would prevent the system from being shipped? A. The mandatory pre-install TDA has not been completed B. The IBM System Support representatve has not completed the pre-install site visit. C. A pre-sale TDA discovered correctable issues that have not been corrected. D. The opportunity owner has not released it. Aoswern B Question 2 What is the most cost-efectve Capacity on Demand (CoD) ofering that will allow a new analyze the efects of actvatng two cores on an E870 and 32GB of memory for one month? A. Trial B. Elastc C. Enable Mobile Actvaton D. Utlity Aoswern A Question 3 A client is evaluatng business contnuity and high availability solutons for their mission critcal trading applicaton. Which of the following oferings provides a clustered soluton that will minimize unplanned downtme? A. Inactve Partton Mobility B. PowerHA SystemMirror C. Remote Restart D. Live Partton Mobility Aoswern B Question 4 A customer wants to migrate two IBM i 7.2 IPARs to their existng E880. Each LPAR needs VIOS will not be implemented. Which soluton will satsfy the customer's needs?
A. Four PCIe3 12GB Cache RAID SAS adapters and two 5887s (mode 1). each with 12 SSDs B. Two PCIe3 1 2GB Cache RAID SAS adapters and two 5887s (mode 1), each with 12 SSDs C. Four PCle3 12GB Cache RAID SAS adapters and one 5887 (mode 2) with 24 SSDs D. Two PCIe3 12GB Cache RAID SAS adapters and one 5887 (mode 2) with 24 SSDs Aoswern D Question 5 A customer has a tape drive zoned to an 8Gb FC adapter that is dedicated to one LPAR. Which needs to be shared between Four LPARs. Network and storage are being accessed through SEA and NPIV. In additon to assigning the adapter to the VIOS, what else needs to be done? A. Reassign the tape to client LPARs as needed. B. Complete the vSCSl connectvity and map the tape to client partton C. Assign the tape drive to the parttons. D. Complete the NP1V connectvity and map the tape to client partton. Aoswern D Question 6 A customer would like to have a mirrored pair of SAS disks server with dual VIOS. What is needed to accomplish this? A. Four 300GB drives. EXP24S in mode 1 Two SAS adapters B. Four 300GB drives in PCIe Gen3 drawer Two SAS adapters C. Four 300GB drives. EXP24S in mode 2 Integrated SAS adapters D. Four 300GB drives. EXP24S in mode 2 Two SAS adapters Aoswern A Question 7 In the PCIe Gen3 I/O Expansion Drawer how many PCIe3 slots are available per fan-out module' A. 8 B. 6 C. 12 D. 4 Aoswern B Question 8
A customer is considering the purchase of a new EB70. They plan to atach it to an existng V70W using the low profle 8Gb Fibre Channel adapter. Which IBM resource should be used to fnd the supported soluton? A. Confgurator (e-confg) B. System Planning Tool C. System Storage Interoperaton Center (SSIC) D. Knowledge Center Aoswern B Question 9 What availability advantage does POWERS ofer compared to x86 technology? A. Storage Protecton Keys B. Memory Mirroring C. Memory Caching D. Chipkill Memory Aoswern A Question 10 A customer is comparing POWER8 and x86 solutons where availability of the Processor is a consideraton. What is a beneft of the POWER8 architecture? A. First Failure Data Capture B. Redundant registers C. Chip Kill D. Actve Processor Mirroring Aoswern A Question 11 Which of the following workloads can be managed using IBM Cloud PowerVC Manager? A. Windows and Linux B. Linux and Solaris C. z/OS and AIX D. Linux and AIX Aoswern D
20% OFF USE Coupen Code Save20 Thank You For Downloading C9010-262 Exam PFD Demo (Start Your C9010-262 Exam Prepration) Get Updated C9010-262 Exam Dumps PFD Demo & Pass in First Attempt Buy Full Product Visit the Link Below https://authenticdumps.com/dumps/c9010-262/