Autonomous Quad-Rotor Project:

General Meeting 25-Jan-2011. ICARUS. Autonomous Quad-Rotor Project:. I ntegrated C omplex A dvanced R obotic U nmanned S ystem. Agenda. 12pm-12:30pm: Business Meeting Ben Wasson 12:30-2pm: Engineering Meeting/Progress David Gitz. Phase Development. Phase 5. Phase

roger
Download Presentation

Autonomous Quad-Rotor Project:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. General Meeting 25-Jan-2011 ICARUS AutonomousQuad-Rotor Project: Integrated Complex Advanced Robotic Unmanned System

  2. Agenda • 12pm-12:30pm: Business Meeting Ben Wasson • 12:30-2pm: Engineering Meeting/Progress David Gitz

  3. Phase Development Phase 5 Phase 4 Phase 3 Phase 2 Phase 1

  4. Engineering Meeting • Vehicle • Ground Control Station Interface (GCSI) • Test-Stand

  5. Vehicle • Phase 1 Objectives: • Design and Build Vehicle • Program for S/W ver 1.0 functionality • Design • CAD Model – 90% • Prototype Systems – 15% • Fabrication – 0% • Electronics – 50% • Schematic/PCB • Programming – 5%

  6. Test-Fixture Attachment System Recovery System Safety System Camera System Heat Removal System Prototype Systems Landing Pad

  7. GCSI • Phase 1 Objectives: • Program for S/W ver 1.0 functionality • Development – 100% • Development on hold pending Validation results • Validation – 5% • Release 0.2 is out in Beta Testing at Wash-U

  8. Test-Stand • Phase 1 Objectives: • Design and Build Test Stand • Design • Fabrication

  9. Questions to Answer • Funding: • Current Projected Cost - $2,000 for one Vehicle

  10. System Description

  11. Capabilities

  12. Technologies

  13. InmarSat Satellite GPS Satellite Zigbee Wi-Fi Cellular SATCOM 900 MHz (Video) Internet Connectivity Diagram Vehicle WAN Cellular Network Ground Entry Point RCU GCS

  14. InmarSat Satellite GPS Satellite Command/Control Video GPS Services Diagram Vehicle WAN Cellular Network Ground Entry Point RCU GCS

  15. System Specifications • Range: ~1.5 km LOS (~3km with Xbee Mesh Network) • Duration: • Vehicle: ~12 min (100% Throttle) , ~20 min ( Hover) • RCU: ~4-6 hrs • GCS: ~4-6 hrs (including field charging Vehicle) • Speed: ~2 - 4 kph • Weight: ~5.5 lbs • Size: 48” x 48” x 10.5” • Propeller Rotation: Max: 3,000 RPM • Vertical Thrust: ~14.2 lbs

  16. Questions? • Contact: • David Gitz: david.gitz@icarusuav.com • Ben Wasson: ben.wasson@icarusuav.com