Case Study – Foothills Region, Canada 2008 CASING DRILLING TM Plastering Success

860. 960. 1060. Measured depth, meters. 1160. 1260. 8. Days from Drill-out of Previous Casing. 4. 6. 12. 0. 10. 2. Case Study – Foothills Region, Canada 2008 CASING DRILLING TM Plastering Success. 9-5/8” casing x 12-1/4” EZCase drilled from 850 M to 1,250 M

rollin
Download Presentation

Case Study – Foothills Region, Canada 2008 CASING DRILLING TM Plastering Success

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 860 960 1060 Measured depth, meters 1160 1260 8 Days from Drill-out of Previous Casing 4 6 12 0 10 2 Case Study – Foothills Region, Canada2008 CASING DRILLINGTM Plastering Success • 9-5/8” casing x 12-1/4” EZCase drilled from 850 M to 1,250 M • CD effectively reduced lost circulation while drilling • NPT reduction > 50%

  2. 100% 50% 0% 2008 Results from Canadian Foothills: Circulation Improved while Drilling Ahead Stop drilling Drilling Partial Loss Measured depth, meters

  3. Artic Permafrost Application Mackenzie Delta –Canada • Conventional Drilling Issues • Keeping Permafrost frozen is critical to • wellbore stability. • Hydrates and borehole erosion. • Mud cooling is required. • Conventional drilling requires high flow • rates for hole cleaning. • Lots of problems with high flow rate • coolers. • Difficult to keep hole stabile while tripping • to run casing. • Small pumps dictated by ice road limits. SPE paper 111806

  4. Artic Permafrost Application Mackenzie Delta –Canada • Casing Drilling Solution • Drilling with casing: • eliminated need to trip. • allowed good cleaning at low flow rates. • minimized pressure losses (heating). • implemented with small pumps • BHA: 17-1/2 EZCase bit, stab, float collar, joint of • casing, float collar, stab, 4 jts casing, stab, csg • Mud cooling. • KCl polymer mud (8-10% KCl depresses • freezing) • Spiral heat exchanger, ammonia • refrigerant, glycol heat exchanger fluid • Spiral exchanger minimized plugging • but gave adequate contact surface and • time.

  5. Conclusions/Observations • Minimized flat time. • No borehole stability issues. • Cooling system & CD prevented • permafrost from degrading. • Extended casing setting depth • well below base of permafrost. • Kept ROP below 15m/hr to • minimize need to stop drilling • and circulate for hydraulic lift. • Walnut hull sweeps used to • control balling. • EZCase drilled out with TCI bit.

  6. CASING DRILLING® Project Summary Pan American ENERGY, Argentina • PAE received approval from government to extend its Cerro Dragon concession (4000 Km2) to 2017. They will drill approximately 300 wells /year. • At least 10% of these well will benefit from CwD, due to problems associated to Water Injection/ depletion problems (High Losses). • CwD project initiated as Enhanced Productivity Project (rather than Drilling) • A typical well is cased with 9 5/8” @ 300m & 5 ½” @ 2,400m. • Tesco® Project: Evaluate a 5 well Project with 5½” BRT® OBJECTIVE: To be able to drill the production hole with minimum NPT associated to losses, trips, allowing a positive impact on the productivity of the well

  7. Pan American ENERGY Project Summary C Dragon C Grande Conv. CD4 CD5 Conv. CD1 CD2 CD3 • Successfully drilled both areas: Averaged 14 days/well. • Reduce NPT related to loss circulation and highly damaged reservoirs. • Reduced production hole from 13 to 11 days. • Good quality wells: Better CBL’s and one well did not require fracturing. • C Grande previously considered not accessible. • Value: Less Completion Costs & possibly better productivity . • CURRENT CUSTOMER STATUS: PAE Evaluating production results. PAE requesting fiscal leverage from government related to technology deployment, in order to start back in Jan 09

  8. SUCCESS IN THE ARABIAN GULF What: 2nd OFFSHORE DIRECTIONAL CASING DRILLING™ from a SIDETRACKWhere: QATAR – MIDDLE EAST Challenge: • Lost 2 BHA’s drilling conventionally • thru the unstable shale formation. Objective: • Drill a directional section through unstable • shale formation with 9 5/8” casing. Results: • Used CDS™ to make up and run 9 5/8” • casing, then drilled with the casing • CASING DRILLING™ successfully drilled the • 12 ¼” hole section into the reservoir Job Details: • Casing Size: 9-5/8 - 47Lbs/ft, L80, BTC c/w MLT™ Rings • CASING DRILLING™ footage drilled 1,416 ft • Job Date: September, 2008

  9. SUCCESS IN THE ARABIAN GULF RSS CD-BHA Operations: • BHA: PDC Bit/Rotary Steerable/MWD/RR/UR/Motor/DLA • No issues tripping / drilling casing thru openhole sidetrack • Used 1 BHA to drill the entire hole section at 38 ft/hr • Successfully set / retrieved BHA using drill pipe (Level 3) • Built from 65° to 86.4°, turning the azimuth from 272° to a 292° • Unstable shale, pack-off csg near TD in the top of the reservoir • BHA, tripped thru casing to surface, leaving shale behind casing Highlights: • No QHSE incident occurred during the Job • No rig modifications were required • Tesco’s CDE™ torque modeling proved reliable • No loss circulation, Torque and Drag trended well • Achieved desired directional trajectory • Provided cased wellbore into reservoir.