An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. www.healthandsafetytips.co.uk Notification of a Construction Project on Form - F10 By John Johnston AIIRSM Health and Safety for Beginners www.healthandsafetytips.co.uk

    2. www.healthandsafetytips.co.uk When Should Form F10 Be Sent to the HSE? The form F10 should be sent to the HSE as soon as the Planning Supervisor has been appointed to the project. If the project is for a domestic client, the form should be sent to the HSE as soon as the contractor has been appointed to the project.

    3. www.healthandsafetytips.co.uk What Details Should be Provided on the Form F10? Date of sending the form Address of the construction site Name and address of the client Type of project Name and address of the Planning Supervisor Acknowledgement by the Planning Supervisor that they have been appointed

    4. www.healthandsafetytips.co.uk What Details Should be Provided on the Form F10? Name and address of the appointed Principal Contractor An acknowledgement by the Principal Contractor that they have been appointed Planned start date for construction work Duration planned for the construction Estimated maximum number of people who will work on site Number of contractors there will be Name and address of any contractors already chosen

    5. www.healthandsafetytips.co.uk NOTE If all the details are not known at the time the form F10 is sent to the HSE, as much detail as possible must be sent and the remaining details forwarded as soon as they are known.

    6. www.healthandsafetytips.co.uk Notification of a Construction Project on Form - F10 By John Johnston AIIRSM Health and Safety for Beginners www.healthandsafetytips.co.uk