1 / 10

Electronic / On-Line Work Permit and Notification Form (E-WPNF) Improvements

Electronic / On-Line Work Permit and Notification Form (E-WPNF) Improvements. Subcontractor Safety Subcommittee – Update Meeting – February 22, 2007. E-WPNF Improvements. Complaint: Listing the “Project Number” in the “Action” field doesn’t indicate the scope of work to be performed. Remedy:

zeheb
Download Presentation

Electronic / On-Line Work Permit and Notification Form (E-WPNF) Improvements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electronic / On-LineWork Permit and Notification Form(E-WPNF)Improvements Subcontractor Safety Subcommittee – Update Meeting – February 22, 2007

  2. E-WPNF Improvements Complaint: Listing the “Project Number” in the “Action” field doesn’t indicate the scope of work to be performed. Remedy: The “Job Description” will be now listed in the “Action” field to more conveniently indicate the scope of work.

  3. E-WPNF Improvements Complaint: Entries that are either superseded by another entry or otherwise no longer valid should be deleted. Remedy: The TM/CC will have editing privileges to delete entries that are superseded or unapproved.

  4. E-WPNF Improvements Complaint: The date the entry was submitted for approval should be displayed on the approvers screen. Remedy: The entry submittal date will be displayed.

  5. E-WPNF Improvements Complaint: The date the entry was approved by the Building Manager should be displayed on the approvers screen for the SSO. Remedy: The Building Manager’s date of approval will be displayed on the approvers screen.

  6. E-WPNF Improvements Complaint: There is not a means by which a primary approver is able to set up an alternate approver to cover days he or she is away from the Lab. Remedy: Primary approvers can set up an alternate approvers list thru Matt Arena, arenam@fnal.gov. Alternates will receive the notification each time the primary approver receives notification, but will take no action unless instructed by the primary approver.

  7. E-WPNF Improvements Complaint: There is no provision for a Building Manager to direct comments to the TM/CC via the approval screen. Remedy: A field will be provided on the approval screen for Building Manager comments.

  8. E-WPNF Improvements Complaint: The form needs to accommodate multiple buildings and multiple Building Managers. Remedy: A “duplicate” feature will be added to the electronic form. This will allow the TM/CC to send individual entries to each Building Manager and SSO as needed without having to retype the form.

  9. E-WPNF Improvements Complaint: There is no provision to re-open and edit an entry. Remedy: An “edit” feature will be enabled if the entry submittal is rejected allowing the TM/CC to revise the form. This feature will not be enabled if the entry submittal is approved.

  10. E-WPNF Improvements • These features will be available by the end of March 2007. • If you have any other comments or complaints about this e-form please direct them to Tom Prosapio at prosapio@fnal.gov. Thank You