Transit Advisory Committee Meeting 6 December 2006

In Partnership with. more choices faster travel doing it safely moving more people. I-95/395 HOV / Bus / HOT Lanes Project. Transit Advisory Committee Meeting 6 December 2006. Project Team Members. VDOT: Larry Cloyed VDOT Project Manager Valerie Pardo Multimodal Liaison

ron
Download Presentation

Transit Advisory Committee Meeting 6 December 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. In Partnership with more choices faster travel doing it safely moving more people I-95/395 HOV / Bus / HOT Lanes Project Transit Advisory Committee Meeting 6 December 2006

  2. Project Team Members • VDOT: Larry Cloyed VDOT Project Manager Valerie Pardo Multimodal Liaison • Fluor / Transurban: Fluor Sharon Gookin Deputy Project Director Jeff Cole Project Development Manager Transurban Ken Daley Vice President Tim Young Project Development Manager Jennifer Aument Public Affairs Manager • HNTB Corporation: Matthew Huston Senior Transportation Planning Engineer

  3. Agenda • Brief Project Overview • Project Status • Transit Elements of Project • Preliminary Schedule • Transit Opportunity Study • Next Steps

  4. 56 miles of managed lanes Project scope consists of: Expansion of existing two lane HOV/Bus system to three lane HOV/Bus/HOT Lanes system Extension of HOV/Bus/HOT Lanes to Fredericksburg/Massaponax Demand management pricing to maintain free flow Reliability All electronic tolling HOV-3+ ride free per current law Buses ride free; no trucks Propose 33 new/existing NB/SB entry/exit points to HOT lanes I-95 / 395 Corridor

  5. Project Status • Concurrence from FHWA on Environmental Review Process • Categorical Exclusion (North) • Environmental Assessment (South) • Executed Interim Agreement • Transportation Partnership Opportunity Fund Loan • Funding for the environmental review • Continuing discussions with key stakeholders • Advancing engineering in support of environmental process

  6. Transit Elements of Project • Initial Proposal • Investments in infrastructure to support current and future transit operations • New exit and entry points • 28-mile extension of HOV/HOT/Bus system • Connection with Phase VIII/Capital Beltway HOT Lanes • Excess revenue for transit activities in the corridor • Six new Park & Rides • Enhancements to 12 existing bus stops/stations along the corridor • Potential refinements to Initial Proposal • Addition of Shirlington ramps • Additional entry/exit points to address effect of BRAC action • In-line station at Lorton • Future development of Park & Rides

  7. Preliminary Schedule Northern Project 14th Street Bridge Corridor Project Southern Project Ft Belvoir/Quantico BRAC Schedule

  8. Transit Opportunity Study • Prepared transit ‘opportunity’ maps • Based upon existing service routes, proposed new access locations, and known origins/destinations within the corridor • Met with key stakeholders to solicit feedback • VDOT • DRPT • Transit Stakeholders • TDM Groups • Prepared draft transit service changes and circulated for comments, culminated in group discussion and formal feedback • Finalizing the results of outreach efforts into a Transit Opportunity Study Report for the corridor • Coordinate with Transit Advisory Committee

  9. Interactive Coordination Process Transit Advisory Committee Feedback for CLRP Feedback on Ramps Feedback on P&R Vision for Region Fluor-Transurban w/VDOT Transit Opportunity Study Refined Designs Traffic ModelingMicrosimulations

  10. Next Steps • Actively progressing the traffic model, the operational analysis of termini points, and preparation of the NEPA documentation • Delivery of the Transit Opportunity Study to VDOT/DRPT, Transit Advisory Committee • Initiation of the 2007 CLRP process • Input Assumptions due January 26th • Assumptions released for public review – February 15th • Proactive program of outreach to local governments, transportation groups, and other stakeholders • Commitment to a transparent process • Formal processes (NEPA, CLRP) offer opportunities for public input • Regular information updates to stakeholders

  11. In Partnership with more choices faster travel doing it safely moving more people I-95/395 HOV / Bus / HOT Lanes Project Contact Information Jennifer Aument (703) 861-5810 jaument@transurban.us.com www.faster95.com Larry Cloyed (703) 313-6686 Larry.cloyed@vdot.virginia.gov