1 / 17

The data assimilation system implementation and output for validation

The data assimilation system implementation and output for validation. Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN. ELDAS Data Coordination meetin g – Météo-France Toulouse 17-18 September 2003. Plan of the presentation. ELDAS at Météo-France The implementation of the system

ronli
Download Presentation

The data assimilation system implementation and output for validation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The data assimilation system implementation and output for validation Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS Data Coordination meeting– Météo-FranceToulouse17-18 September 2003

  2. Plan of the presentation • ELDAS at Météo-France • The implementation of the system • Model (ARPEGE) • Climatology (ECOCLIMAP) • The coupling to atmosphere (Restore/Blending) • Data Assimilation technique (Simplified 2D-VAR) • DATA flow • The assimilated data • The output for validation • PRELIMINARY EXPERIMENTS • 1-6 June 2000 • May 2003

  3. ARPEGE:Global spectral stretched model 20 to 200 km, 41 levels (1 hPa) , 4 runs/day (96h) 4D-Var (T107, T161) : 6h assimilation cycle The NWP model Cycle 26 (Current) Operational version: (stretching 3.5 )

  4. Spatial Coverage

  5. The implementation of ECOCLIMAP • Global 1km database (V. Masson et al., 2003) • Issued combining existing land-cover maps, climate maps, in addition to using the AVHRR satellite data LAI for January and June from ECOCLIMAP See:http://www.cnrm.meteo.fr/gmme/PROJETS/ECOCLIMAP/page_ecoclimap.htm A 10km aggregation is used for ARPEGE input climatology

  6. +6hfcst +6hfcst +6hfcst +6hfcst The land surface analysis OI New T2m, Rh2m, Ts, Tp, Ws 2D-Var New Wp The atmospheric coupling • The atmospheric state is not re-analysed • 2 solutions:Restore or Blending

  7. Archive AtmosphericAnalyse Atmosphericguess Atmosphericguess +6hfcst New Land Surface Analysis The atmospheric coupling Restore Blending Archive AtmosphericAnalyse « + » New Land SurfaceAnalysis New Land SurfaceAnalysis

  8. Plan of the presentation • ELDAS at Météo-France • The implementation of the system • Model (ARPEGE) • Climatology (ECOCLIMAP) • The coupling to atmosphere (Restore/Blending) • Data Assimilation technique (Simplified 2D-VAR) • DATA flow • The assimilated data • The output for validation • PRELIMINARY EXPERIMENTS • 1-6 June 2000 • May 2003

  9. The assimilated data • T2m RH2m (analysed by the Optimum Interpolation on ARPEGE grid) • Observations are available every 6 hours. • No other observations are assimilated (at present).

  10. Field site temporal data • Extracted from Arpege 6h forecast cycle (1 hour rate) • Nearest model grid point • No post-processing (at present) to compensate field site / model differences. Spatial data • Extracted from Arpege grid: • LAT, LON, VALUE • No extrapolation to ELDAS regular lat lon grid (at present) • No grib produced (at present)

  11. Field site climatology: Loobos Site

  12. Plan of the presentation • ELDAS at Météo-France • The implementation of the system • Model (ARPEGE) • Climatology (ECOCLIMAP) • The coupling to atmosphere (Restore/Blending) • Data Assimilation technique (Simplified 2D-VAR) • DATA flow • The assimilated data • The output for validation • PRELIMINARY EXPERIMENTS • 1-6 June 2000 • May 2003

  13. PRELIMINARY EXPERIMENTS • 1-6 June 2000 and zoom over ELDAS domain • May 2003: Ecoclimap and Operational cycles

  14. Schedule of activities Implementation part • The implementation of the system [done] • Validation of Atm. Coupling method [in progress] • Optimization of cycle settings [in progress] Output data production • Trial dataset 1-6 June 2000 [done] • May-June 2000 [to be done: ready to start] • May-October 2000 [by end of 2003]

More Related