Calibration and monitoring of the experiment using the Cockcroft-Walton accelerator

Calibration and monitoring of the experiment using the Cockcroft-Walton accelerator. G. Signorelli Sezione di Pisa MEG Review meeting - 20 Feb. 2008 On behalf of the CW group. Disclaimer.

ronnar
Download Presentation

Calibration and monitoring of the experiment using the Cockcroft-Walton accelerator

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Calibration and monitoring of the experiment using the Cockcroft-Walton accelerator G. Signorelli Sezione di Pisa MEG Review meeting - 20 Feb. 2008 On behalf of the CW group

  2. Disclaimer • All the plots that I am going to show are to be considered as “online-plots” since we did not try to apply any calibration apart from gain equalization (trigger waveforms) • Further work is needed to understand the calorimeter uniformity, extract the PMT quantum efficiencies and hence the resolutions

  3. Intro & reactions • The Cockcroft-Walton accelerator was installed for monitoring and calibrating the MEG experiment • Protons on Lithium or Boron • Li: high rate, higher energy photon • B: two (lower energy) time-coincident photons >11.7 MeV 4.4 MeV >16.1 MeV Lithium spectrum on NaI 17.6 MeV line 14.8 MeV broad resonance

  4. Installation issues • Centering & Monitoring of the beam when the beam line is fully mounted • Pixel target • Movable crystal w/camera • Target reliability and durability • Search for different target materials • Study of different targets • Connection with the rest of the experiment • Insertion/extraction • Connection with PSI • Integration of the safety system • Approval of Swiss Ministry of Health.

  5. Beam monitoring • A pixel target mounted, tested and used to center/measure the beam spot • A hybrid pixel-physics target is foreseen for the future • The quartz crystal allows for the monitoring of the beam before the entrance into the bellows system • A MathLab program was developed

  6. Target development • Lithium • A LiF crystal target was tested and proved to be more reliable and durable: using one target for the full run • Boron • Metallic Boron • B4C - Boron Carbide • Hybrid target (Li2B4O7 or LiB3O5) • Possibility to use the same target and select the line by changing proton energy B lines appear increasing p energy B lines (coincidence) rate improves dramatically by increasing p energy

  7. Daily insertion of the p-target • COBRA volume was sealed with the nitrogen bag to protect TC PMTs • Insertion of CW pipe modifies volume • Control of the gas flow • Speed ~ 3.5 mm/sec • < 10 minutes insertion/extraction • PCOBRA < 2 Pa • Pchambers not appreciable • CW pipe locks the insertion of the muon target PCOBRA 2 Pa Start-up Slow-down 10 min Pchambers

  8. PIXE • We tested the Proton-Induced X-ray emission from different materials • Possible to have an independent current normalization • Possible usage for DCH monitoring • The energy of the X-ray can be easily chosen in a wide range by having a suitable target material • IXE could be used as a  rate measuring device. Cu target P-beam mylar window X-ray detector

  9. Physics: monitoring • The main purpose of the CW is to monitor the stability of the xenon calorimeter • Twice-a-week we had a 1-morning data taking • Gain familiarity with the apparatus • Learn the best way for implementing this calibration • Monitor liquid xenon during purification • Clear 17.6 MeV peak on the 14.8 MeV broad resonance • We could follow the improvement of light yield • Correlation with absorption length measurement with -sources Purification

  10. Uniformity and time scale • Rate on calorimeter ~6 kHz • By uniformly illuminating the calorimeter we can monitor the response of the detector at various positions. • It is possible to perform the monitoring with a 30 min run • Suitable to follow the calorimeter day-by-day variations Corrected applying rough equalization from -runs “raw” spectrum (rad) (rad)

  11. Boron target • The 2 simultaneous lines are useful to exploit the coincidence • Clean spectrum in the calorimeter by requiring a signal in the timing counter • Used at trigger level • Used for the initial set-up of the e  trigger 4.4 MeV 4.4 and 11.6 MeV Compton Edges Energy deposit in XEC 11.6 MeV “Energy” deposit in TC ttrigger (LXE - TC) in 10 ns bins

  12. One more word on CW & TC • The possibility of abundant and uniform gamma rays from Li and B is being exploited to • Equalize the TC bars • Measure TC bar parameters • Veff,eff • Study the TC - LXE coincidence • Timing synchronization and resolution, independent of the reconstruction of the positron track • Again: calibrating the apparatus during beam-off periods

  13. Low energy vs high energy • We can monitor on a day-by-day basis at an energy which is 1/3 of the working point of our detector; • Thanks to the good linearity of our detector we can confidently extrapolate at higher energies “CW” lines 52.8 MeV Measured in 0 runs See physics talks

  14. Conclusion • At mid October we were ready to deliver calibration photons at the center of the MEG detector • Since 5 November we had a twice-a-week calibration and monitoring session for the experiment • XEC calibration and monitoring • TC calibration • Trigger set-up • Some of these were unforeseen, the CW proved to be extremely useful • The CW beam line was dismounted on Dec. 15 to install the liquid hydrogen target • Confirmed the energy scale and (dis)uniformity • We can confidently monitor the calorimeter in the 20 MeV range

  15. Todo’s • The CW calibration has the advantage to allow the experiment set-up and calibration even during beam-off periods • We are using this inter-run time to: • Implementing some new beam line elements • Pneumatic Faraday cup • Pneumatic quartz crystal • Hybrid physics and pixel target • Studying timing calibration techniques • We are studying a way of tagging in an independent way one of the two photons from boron, to give a T0 to inter-calibrate XEC and TC