Electrophotographic Development and Transfer Station Update Week 3 Progress Report Ben Nguyen Dan Prosser Adam Regula Steve Snyder Amar Mohamed
Team Norms and Values • Meeting Times • Fridays: Weekly • Monday 8-10 pm: Weekly • Wednesdays 2-4 pm: If needed • Project Report Presentation • Finish any other deliverables • Meeting Attendance • Friday and Monday Meetings • Attendance is mandatory. If a team member cannot make the meeting for any reason, he should notify the rest of the team ASAP and get an update later from a team member. • Wednesday meeting • All members do not necessarily have to attend, but should if possible, especially if there are outstanding deliverables. Get update from team. • Ethical Concerns • All work done belongs to the group and should be shared with the group. • Cite sources whenever necessary in documents and presentations • Pictures • Information • Decision Making • Majority rule for major decisions • Subsystem leads get greatest influence in decisions about their subsystems. • Presentations • Every group member should participate equally in the presentations.
System Functional Diagram Carriage movement to each station Process Flow Charging Station Exposure Station Development Station Pre-Transfer Erase Transfer Station Apply uniform charge to photoreceptor Light reduces voltage in exposed area of photoreceptor Apply charged toner particles to photoreceptor Normalize voltage on photoreceptor Transfer toner from photoreceptor to paper
Functional Specs Map Function Apply uniform charge to photoreceptor Light reduces voltage in exposed area of photoreceptor Apply charged toner particles to photoreceptor Normalize voltage on photoreceptor Transfer toner from photoreceptor to paper Functional Spec Uniform Final Voltage Exposed Voltage Developed Mass/Area (DMA) Photoreceptor Erased Voltage Transferred Mass/Area (TMA)
LabView Components Front-End Back-End Outputs Wiring VI Code Controls - Stepper motor control - Velocity - Acceleration - Voltage - Time spent at each station - Reinitialization control - Interface (Ease of use)*** - Plots of voltage, velocity - Record charge before/after charge, etc. - Show which station is being utilized - Interface (Ease of use)*** - Document wiring diagram - Physically label wires for future projects - Modularize design - Use SubVI's to reduce programming complexity
Summary • Accomplishments • Team Norms/Values • Pair-wise Comparison • Functional Diagram • Gantt Chart • Look Ahead • Concept Generation • Risk Assessment • Engineering Specifications • Quality Functional Deployment