1 / 12

Cyber Electrical-Engineering Department CED Towards World-Class IT Infrastructure

Cyber Electrical-Engineering Department CED Towards World-Class IT Infrastructure. Departemen Teknik Elektro ITB. Agenda. Visi dan Misi Kondisi Eksisting Kondisi yang ingin Dicapai Program Kerja Partnership. Visi CED.

Download Presentation

Cyber Electrical-Engineering Department CED Towards World-Class IT Infrastructure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cyber Electrical-Engineering DepartmentCEDTowards World-Class ITInfrastructure Departemen Teknik Elektro ITB

  2. Agenda • Visi dan Misi • Kondisi Eksisting • Kondisi yang ingin Dicapai • Program Kerja • Partnership

  3. Visi CED • Menjadi salah satu pusat jaringan pengetahuan bidang teknik elektro dan yang terkait di Asia

  4. Misi • Melakukan proses akusisi, penyimpanan, produksi, pemrosesan, pengiriman, pengelolaan pengetahuan yang terkait dalam bidang teknik elektro, baik untuk keperluan pendidikan, penelitian maupun pelayanan masyarakat baik lokal maupun global

  5. Kondisi Eksisting 1SDM • Dosen : 102 • Professor : 6 • Doktor : 43 • Master : 30 • Mahasiswa : 1125 • S1 : 800 • S2 : 300 • S3 : 25 • Staff Administrasi dan teknisi : 50

  6. Kondisi Eksisting 2Infrastruktur dan Aplikasi • Jumlah Terminal PC: 200 • Link Internet : AI3 dan Indosat (LSS) • Aplikasi • Sistem Informasi Akademik (Parsial) • Sistem Informasi Kepegawain (Parsial) • Digital Library (Parsial) • WEB EE (Parsial)

  7. Kondisi HarapanExpected Service Level • Dosen : 1 PC /dosen : 102 • Mahasiswa : • S2 : 1 PC /2 mahasiswa : 150 • S1 (Tingkat 4): 1 PC/3 mahasiswa : 70 • S1 (tingkat 2 dan 3): 1 PC/5 mahasiswa : 120 • Administrasi dan Teknisi : 20 • Total 462 • Rata rata 1 PC untuk 2.7 pengguna

  8. Keperluan Bandwidth Intenet • Pengguna : 1277 • Asumsi : • Durasi akses per pengguna/hari : 2 jam • Jumlah jam kerja/hari : 12 jam • Jumlah shift/schedulling : 6 Shift • Kecapatan akses rata-rata : 4 Kbps • Keperluan link Internet : 215*4 • = 860 KBps

  9. Program Kerja • Pemantapan dan intergrasi aplikasi (Dilakukan oleh tim Elektro) • Penambahan terminal akses (PC), 260 PC • (Bekerjasama dengan Perusahaan dan sumbangan alumni) • Penambahan server 3 buah (Bekerjasama dengan Perusahaan dan Sumbangan Alumni) • Penambahan link internet sebesar 750 Kbps (Bekerjasma dengan Perusahaan Sumbangan Alumni) • Penyempurnaan jaringan dalam kampus (Bekerjasama dengan Perusahaan dan sumbangan Alumni)

  10. Biaya Operasional • Operasi Link : 0.85 Mbps • SDM : • CIO : Rp. 1.5 Juta/bulan • 1 Teknisi : Rp. 600.000/bulan • Adminitratur Lab : Rp 8 x 200.000 • O&M Komputer • Rp 5 Juta / Bulan

  11. Sumbangan (Perusahaan, Alumni,Perorangan) • PC Baru : ……… buah • PC bekas : ………buah • Link Internet : • Perbaikan infrastruktur/jaringan • Penyumbang : • Nama : • Alamat: • Telpon/e-mail

  12. Kontak Person Sekretaris Departemen Teknik Elektro Dr. Suhono Harso Supangkat 0222500985 suhono@itb.ac.id

More Related