COB 300C - The Operations Dimension

COB 300C - The Operations Dimension. Master Production Scheduling and Material Requirements Planning (bring class examples to class). Master Production Scheduling and Material Requirements Planning (Detailed Material Planning).

ros
Download Presentation

COB 300C - The Operations Dimension

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COB 300C - The Operations Dimension Master Production Scheduling and Material Requirements Planning (bring class examples to class)

  2. Master Production Scheduling and Material Requirements Planning (Detailed Material Planning)

  3. Maine Woods Co. Aggregate Plan (partial) Wheel Goods Product Group Regular Over Forecast Time Time Inventory Month Demand Production Production Beginning Ending Sept. 2,500 2,000 1,000 500 Oct. 2,900 2,000 400 500 0 Nov. 2,400 2,000 400 0 0 Dec. 2,000 2,000 0 0

  4. Maine Woods Co. Master Production Schedules, Wheel-Goods Product Group

  5. Alternative Process for Developing a Master Production Schedule

  6. Calculation of Total Capacity Requirements for a Master Schedule(Slide 1 of 3)

  7. Calculation of Total Capacity Requirements for a Master Schedule(Slide 2 of 3)

  8. Calculation of Total Capacity Requirements for a Master Schedule(Slide 3 of 3)

  9. Calculation of Estimated Capacity Requirements for Individual Work Stations

  10. Material Requirements Planning • Planning for all the parts and components necessary to support the master production schedule (MPS). • MRP tells us for “how much” and “when” to launch replenishment orders for dependent demand items (i.e., it is time phased) • MRP record processing has several required pieces of information

  11. Information Required for MRP Record Processing • Bill of Material • Current Inventory Status Data • on hand • scheduled receipts • Master Production Schedule (MPS) • Planned Lead Time Information • Order Policy • minimum (minQ), multiple (Q=), lot-for-lot (LFL)

  12. Exploded View ofMaine Woods’ Tricycle

  13. Product Structure Tree Diagram for Maine Woods’ Tricycle