The Isles of Scilly • 40 km off Lands End • 5 inhabited • Only these 5 have electricity supplies • Population approximately 2000 people
Electrical Network Supplies by a 33kV undersea cable from the mainland 11kV submarine cables interconnect and feed the islands 64 substations with a mix of overhead and underground network Back up diesel generation to secure supplies
Network Management Project LV monitoring has been installed on the 64 substations supplying customers Smart Meter Battery Broadband over Powerline Modem Rack-mounts for Radios Main Supply & Battery Changeover RCDs Serial acquisition device AC/DC Converter Heater Main Fuses
Communications Backhaul TCP/IP-based network which uses three technologies: GE SD4 radios – 400MHz – 19.2kbps GE Entranetradios – 2.4Ghz – 106kbps PPC Broadband over Powerline – BPL – 50Mbps A 150Mbps microwave link connects to the mainland
Benefits Trending of individual substation in NMS Metered values stored on a central server Greater visibility of asset capacity and utilisation Enables automation roll-out Comparison of communication systems
Generator Installation 2 x 200kVA peak diesel generators have been installed on both St Agnes and Bryer FG Wilson P200-2 generators with ComApInteliGen-NT controllers Remote control and additional automation installed Star-Star transformers installed to provide HV neutral earth
Proposed Scheme St Agnes – Lower Town St Mary’s Primary Gen Controller 33kV Synch Signal IoSCommsNetwork 11kV 415V 11kV Synch Controller Bryer – The Quay Gen Controller Mainland CommsNetwork Synch Signal 11kV 415V St Buryan Primary Synch Controller 33kV 11kV
Key Benefits Automated blackstartrestoration Ability to switch over to generator supply and back without short interruptions Reduce issues with frequency control on a weakly connected network Allow a larger amount of embedded generation without introducing frequency oscillation issues
Thanks for listening Ben Godfrey Western Power Distribution Innovation and Low Carbon Networks Engineer 01332 827447/07894258687 bgodfrey@westernpower.co.uk