100 likes | 136 Views
JWST Data Management Systems. Gretchen Greene. JWST Mission Hierarchy for DMS. DMS Estimated Archived Data Volumes – Baseline. JWST DMS Interface Context. S&OC. Project Level Agreements will be defined ~L-24mo. JWST vs. HST DMS….
E N D
JWST Data Management Systems Gretchen Greene
JWST DMS Interface Context S&OC Project Level Agreements will be defined ~L-24mo
JWST vs. HST DMS… Many Similarities, systems reuse (DADS, MAST), and lessons learned, however there are… • Key Basic Differences: • Order of magnitude increase in computational and I/O DMS throughputs • Flight Operations System interfaces to DMS will support direct transfer at STScI of DSN telemetry data and require priority data processing for Wavefront Sensing and Control • Functional Decisions: • As a result of Trade Studies, BOTH HST and JWST will be moving toward scalable distributed architecture • Data Processing Workflow Management system (OWL-CONDOR) • Dynamic Reprocessing of Data Products with CRDS • Online Data Product File CACHE • Higher Level data product generation assumed fundamental • Service based architecture to support multi-mission DMS
MAST + JWST • STScI Archive Access systems include the intersection between the JWST mission operations & MAST • Distribution Services • Archive User Interface (MAST Portal) • User Authentication • Archive Catalog (CAOM) • Online Data Product Cache
JWST SOC DMSRequirements and Design Phases • Completed formal Systems Level 4 Requirements • ~ 650 requirements for I&T verification • Beginning DMS I&T for internal Build 1 • Currently in year 2+ of design and development • Systems Design Review 2 – Dec 6-7, ’12 • Designing for Launch Readiness Data (LRD) 2018 with 95% level of current STScI DMS capability
S&OC Science Systems Engineering, Flight Operations, and Systems Development Timeline for a JWST 2018 LRD