An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transition from the Construction Project to Pre-Ops and Operations Howard Gordon

  2. The ATLAS Experiment – Very International! ATLAS Collaboration(Status October 2002)Albany, Alberta, NIKHEF Amsterdam, Ankara, Ann Arbor, LAPP Annecy, Argonne NL, Arizona, Arlington UT, Athens, NTU Athens, Baku, IFAE Barcelona, Bergen, Berkeley LBL and UC, Bern, Birmingham, Bonn, Boston, Brandeis, Bratislava/SAS Kosice, Brookhaven NL, Bucharest, Cambridge, Carleton/CRPP, Casablanca/Rabat, CERN, Chinese Cluster, Chicago, Clermont-Ferrand, Columbia, NBI Copenhagen, Cosenza, INP Cracow, FPNT Cracow, Dortmund, JINR Dubna, Duke, Frascati, Freiburg, Geneva, Genoa, Glasgow, ISN Grenoble, Technion Haifa, Hampton, Harvard, Heidelberg, Helsinki, Hiroshima, Hiroshima IT, Indiana, Innsbruck, Iowa SU, Irvine UC, Istanbul Bogazici, KEK, Kobe, Kyoto, Kyoto UE, Lancaster, Lecce, Lisbon LIP, Liverpool, Ljubljana, QMW London, RHBNC London, UC London, Lund, UA Madrid, Mainz, Manchester, Mannheim, CPPM Marseille, MIT, Melbourne, Michigan SU, Milano, Minsk NAS, Minsk NCPHEP, Montreal, FIAN Moscow, ITEP Moscow, MEPhI Moscow, MSU Moscow, Munich LMU, MPI Munich, Nagasaki IAS, Naples, Naruto UE, New Mexico, Nijmegen, Northern Illinois, BINP Novosibirsk, Ohio SU, Okayama, Oklahoma, LAL Orsay, Oslo, Oxford, Paris VI and VII, Pavia, Pennsylvania, Pisa, Pittsburgh, CAS Prague, CU Prague, TU Prague, IHEP Protvino, Ritsumeikan, UFRJ Rio de Janeiro, Rochester, RomeI, Rome II, Rome III, Rutherford Appleton Laboratory, DAPNIA Saclay, Santa Cruz UC, Sheffield, Shinshu, Siegen, Southern Methodist, NPI Petersburg, Stockholm, KTH Stockholm,Stony Brook, Sydney, AS Taipei, Tbilisi, Tel Aviv, Thessaloniki, Tokyo ICEPP, Tokyo MU, Tokyo UAT, Toronto, TRIUMF, Tsukuba, Tufts, Udine, Uppsala, Urbana UI, Valencia, UBC Vancouver, Victoria, Washington, Weizmann Rehovot, Wisconsin, Wuppertal, Yerevan(149 Institutions) The scientific author list has been updated (as of 30th September), as this will be done now yearly for the purpose of the M&O ‘A’ sharing Total Scientific Authors 1594 Scientific Authors holding a PhD or equivalent 1305 (used for M&O ‘A’ sharing)

  3. U.S. ATLAS Institutions BNL is the Host Laboratory

  4. UX15 civil engineering Status: mid October 2002

  5. Barrel Cryostat ready for insertion • Pressure test with final seals successful • First EM wheel ready • All 64 FTs produced, installation in cryostat finished, all tested • Ready for insertion

  6. U.S. ATLAS Budget Authority

  7. Definitions for the Research Program • U.S. ATLAS Research Program is needed to support the ATLAS Experiment and especially our deliverables. It includes: • Maintenance and Operations (M&O) which includes: • Pre-operations: all activities until operations • Operations: Beams-on time ~8 months/year • Maintenance: Ongoing plus Beams-off time every 1-2 years of ~4 months • Upgrade R&D • Upgrade R&D is envisaged for the luminosity upgrade of the LHC 1035 cm-1 s-1 • New more radiation hardened electronics: Pixels, Silicon Strips, LAr Front End Boards (FEB), LAr ROD upgrade, etc. • Physics and Computing • Installation (defined as inserting the U.S. ATLAS deliverable into ATLAS) is part of the Construction Project

  8. Research Program Needs

  9. U.S. ATLAS Personnel

  10. U.S. ATLAS Skill Mix

  11. US ATLAS - Tier 1 Facility Staffing

  12. Scientific Effort on ATLAS US ATLAS effort will ramp up by a factor ~ 2 by FY07 in anticipation of first LHC beam

  13. U.S. ATLAS Project Management Plan

  14. Separate MOUs for the Construction Project and Research Program

  15. Needs from BNL • Understanding of the Research Contracts to universities • Needs for some transfers of funds to CERN – Category A & B M&O • Plans to increase the DOE base funding for the ATLAS Physics Analysis Center

More Related