1 / 12

Westinghouse/Southern/SCANA - Transition from Construction to Operation CM

Westinghouse/Southern/SCANA - Transition from Construction to Operation CM. Josh Olson Southern Nuclear - Vogtle 3&4 Configuration Management Supervisor. Objectives. Provide an update on construction progress for Vogtle 3&4 and Summer 2&3.

Download Presentation

Westinghouse/Southern/SCANA - Transition from Construction to Operation CM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Westinghouse/Southern/SCANA - Transition from Construction to Operation CM Josh Olson Southern Nuclear - Vogtle 3&4 Configuration Management Supervisor

  2. Objectives • Provide an update on construction progress for Vogtle 3&4 and Summer 2&3. • Provide an overview of the collaborative effort that is currently underway between Southern Nuclear Company (SNC), South Carolina Electric and Gas (SCE&G) and Westinghouse Electric Company to establish and implement the turnover process Vogtle 3&4 and Summer 2&3.

  3. Summer 2&3 Construction Update

  4. Background • Scope of Turnover information • Development of Turnover Infrastructure • Joint Information Turnover Meetings • Pilot Project • Objectives • Participants • Scope • Deliverables

  5. Turnover Pilot Objectives • Perform an inventory of available consortium information • Identify the required utility program information • Determine the transfer processes required for turnover of the information from the consortium to the customer Effective, efficient turnover and transfer of design and jurisdictional authority

  6. Turnover Pilot Participants • Core Team • Configuration Management • Engineering • Information Technology • Initial Testing Program • Document Control • Steering Committee

  7. Turnover Pilot Scope • Standard Plant System (WEC Design) • SFS – Spent Fuel Pool Cooling System • Standard Plan System (CB&I Design) • EDS – Non Class 1E DC and UPS System • Site Specific System (CB&I Design) • YFS – Yard Fire Water System • Area – Main Control Room • Program – MOV Program

  8. Turnover Pilot Deliverables • Scope of Turnover Information • Document / Data Delivery Process • Acceptance Process • Repeatable process applicable to other systems, areas and programs

  9. Lessons Learned • Dedication of resources • Start Early • Project Manager Needed • Teamwork is key • Design Authority Transfer • Contract Detail

  10. Questions?