An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Challenges In Deploying Temporary Polar Seismic Equipment Paul Carpenter IRIS / PASSCAL 6/11/2013

  2. Outline • Current Systems & Design Philosophy • Schedule • Logistics • Challenges from Field Conditions • Design philosophy

  3. Current Systems & Design Philosophy • Current systems well built and designed • High data return • Further refinement • Easy to install or service

  4. Schedule Arctic Prep Arctic Shipping Arctic Field Work Antarctic Shipping Antarctic Prep Antarctic Field Work

  5. Logistics to the Ice • Long shipping lead times • Documentation & paperwork • Hold ups • Weather • Environmental • Mechanical

  6. Logistics on the Ice • Staging Area • Paperwork & coordination • Equipment handling • Storage • Equipment Movement • Pre Site visit prep • Weather has a large role

  7. Field life • Big or small camp • Several to no support staff • Subjected to weather • Camping life style • Diet changes • Removed from society • 24 Hour Sunlight

  8. Weather • Dynamic weather • Low temperatures • Wind • Dry or Wet • Warm!? • Clothing management • Remember to review body condition

  9. Climate & Terrain • Snow & Ice • Crevasse • Blue Ice • Animals • Accumulation • Altitude • 0’ to >10,000’

  10. Field Crew at Site • Physical state • Long hours • Fatigue, exhaustion • Mental state • Stress • Distracted

  11. Design Philosophy • Easy to install or service • Pre-assembled • Ready and running • Minimal construction needed • Modular • Quick swap components • Easy to read and understand lights or screens

  12. Design Philosophy cont. • One Opportunity to Install or Service • Focus • Sensor placement • Data recording