Pit 8 - Cranes & Lift (PZ) Status 14 March 2007

PA1363 (8 t – UXA-B). LASTRA Plat. (120 t). PR762 (3.2 t - UXA). Other items. PR720 (1x40 t – UXB). Nacelles (4). PR725 (1x80 t - PX). Lift (PZ). PR721 (2x40 t - UXB). OK. OK. OK. OK. In order. OK - Repaired. OK. OK. OK. SIG to be upgraded (h=1.80 m).

ross-barton
Download Presentation

Pit 8 - Cranes & Lift (PZ) Status 14 March 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PA1363 (8 t – UXA-B) LASTRA Plat. (120 t) PR762 (3.2 t - UXA) Other items PR720 (1x40 t – UXB) Nacelles (4) PR725 (1x80 t - PX) Lift (PZ) PR721 (2x40 t - UXB) OK OK OK OK In order OK - Repaired OK OK OK SIG to be upgraded (h=1.80 m) 2 (CRIOTEC); 1 (PS); 1 available 2 cables to be changed 13 & 20/04/07 For Radiation Shield - Parking No restriction Restriction – gas piping on gantry Restriction – gas piping on gantry But CV work in PX shaft week 11/07 Radio-command to be installed (1 w) Standby in TX tunnel Pit 8 - Cranes & Lift (PZ)Status 14 March 2007 D.LACARRERE

More Related