An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 0 Section 4(f) Section 6(f)

  2. Section 4(f) Process Overview Project Initiation Package Field Review 4(f) Property Present YES NO Use YES Coordination NO NEPA Document Categorical Exclusion Training Class

  3. 0 Federal Law • The Secretary of the Department of Interior shall not approve any project which requires the useof any significant4(f)propertyunless: (1) There is no feasibleand prudentalternative to the use of such land, and; (2) Such project includes all possible planning to minimize harm resulting from such use OR de minimis impact • 23 CFR 774 Categorical Exclusion Training Class

  4. Definition • Section 4(f) protects: • Publicly-owned Parksand Recreation Areas • Publicly-owned Wildlife and Waterfowl Refuges • Publicly or Privately-owned Historic Sites Categorical Exclusion Training Class

  5. 4(f) Determinations • No 4(f) • No Use • Temporary No Use • de minimis • Programmatic Evaluations • Independent Bikeway & Walkway • Historic Bridges • Historic Sites • Parks, Recreation Areas, and Refuges • Net Benefit • Individual Evaluation Categorical Exclusion Training Class

  6. 0 Coordination • Public Involvement for de minimis • Press Release, at a minimum • 4(f) determination issued by OES • Preliminary discussions between District & OES • District submits determination packet to OES • Completed prior to approval of CE • Included as documentation in project file • FHWA issues approvals for: • de minimis • Net Benefit • Individual Categorical Exclusion Training Class

  7. 0 Online CE - 4(f)/6(f) Tab • Answer all drop-downs appropriately • If OWJ concurrence not needed, do not click on #3 Categorical Exclusion Training Class

  8. 0 Online CE – 4(f)/6(f) Tab Categorical Exclusion Training Class

  9. 0 Remarks • Discuss: • If 4(f) properties are adjacent to the proposed project area, but not impacted, state accordingly • Results of consultation with recognized OWJ(s) • Impacts to identified 4(f) properties and resulting measures to minimize harm • Date of 4(f) determination/approval • OES issues No 4(f), No Use and Exceptions • FHWA approves de minimis and higher Categorical Exclusion Training Class

  10. 0 Remarks • For historic sites, only summarize Section 106 coordination for 4(f) effect determinations • List sites within proposed project area • Discuss impacts to identified sites • Include Section 106 effect finding • Discuss 4(f) determination/coordination dates • Reference maps, photos, & SHPO letter • For projects with only a few historic sites and minimal impacts, a short paragraph will be sufficient Categorical Exclusion Training Class

  11. 0 Example Categorical Exclusion Training Class

  12. 0 Online CE Project File/Part of CE • Recreational 4(f) • Aerial map depicting 4(f) property and project area • Photographs • OWJ concurrence • Public involvement, if applicable • 4(f) determination • FHWA approval • Section 106 4(f) • E-mail • ODOT-OES IOC • FHWA approval Categorical Exclusion Training Class

  13. 0 Points to Remember • Section 4(f) applies to all projects receiving USDOT transportation funds • Only OES can issue 4(f) determinations • Verifies that a property meets 4(f) criteria • Ensures consultation with OWJ occurs and that concurrence is received • FHWA provides approval for certain levels Categorical Exclusion Training Class

  14. 0 Section 6(f) Process Project Initiation Package Identify 6(f) Property ODOT Review FHWA Review 4(f) with 6(f) Cond. App. Identify Impacts & Potential Mitigation ODNR Review (Env. & Appraisals) Approved 4(f) to ODNR/NPS 6(f) Conversion Report NPS Review Categorical Exclusion Training Class

  15. 0 Section 6(f) • Recreational land or facility developed with Land and Water Conservation Funds (LWCF) • National Park Service (NPS)/ODNR • Applies to permanent acquisition (conversion) of land from a recreational facility to a transportation facility • Replacement land of equal or greater value • Applies to temporary use of land • Less than 6 months • Applies to any funding type Categorical Exclusion Training Class

  16. Section 6(f) • Section 4(f) • Permanent or temporary right-of-way requires completion of NPS form • Use form when Temporary impacts to recreational features • Timeframe • Submitted to ODNR for 45 day review • ODNR sends to NPS for 45 day review Categorical Exclusion Training Class

  17. Section 4(f)/6(f) • 4(f) determination issued prior to 6(f) approval • 6(f) Conversion • Preliminary approval of replacement parcels • Submittal of Conversion Report Categorical Exclusion Training Class

  18. 0 Online CE - 4(f)/6(f) Tab Categorical Exclusion Training Class