1 / 9

Group V ICT Infrastructure Requirements

Group V ICT Infrastructure Requirements. Saleem Khan Additional SIO, NIC J&K. ERO Level. Hardware Desktop Computers, Laser Printers, Scanners UPS, DG Set (for problematic areas) Digital Camera, Android Phone Connectivity Leased Line (NICNET/ SWAN) / VPNoBB

ross
Download Presentation

Group V ICT Infrastructure Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Group VICT Infrastructure Requirements Saleem Khan Additional SIO, NIC J&K

  2. ERO Level • Hardware • Desktop Computers, Laser Printers, Scanners • UPS, DG Set (for problematic areas) • Digital Camera, Android Phone • Connectivity • Leased Line (NICNET/ SWAN) / VPNoBB • Router / Switch/ Cables/ IO Boxes • Manpower • Office Asstt./ Data Entry Operators (data entry/ reports/ EPIC/ Complaint handling) • Software • Office Automation Suite (MS Office 2010 pro) • AVS

  3. DEO Level • Hardware • Desktop Computers, Laser Printers, Scanners • UPS, DG Set (for problematic areas) • Android based Phone • Connectivity • Leased Line (NICNET/ SWAN)/ VSAT • Router / Switch/ Cables/ IO Boxes • Video-Conferencing setup • Manpower • Assistant Programmers • Data Entry Operators (data entry/ reports/ EPIC) • Software • Office Automation Suite (MS Office 2010 pro) • AVS

  4. CEO Level • Hardware • Desktop Computers, • Multifunctional Devices • UPS, DG Set (for problematic areas) • Android based Phone • Connectivity • Leased Line (NICNET/ SWAN)/ VSAT • Router / Switch/ Cables/ IO Boxes • Video-Conferencing setup • Manpower • IT Manager • Systems Analyst • Programmers • Data Entry Operators (data entry/ reports/ EPIC) • Software • Office Automation Suite (MS Office 2010 pro) • AVS

  5. State Level • Setting up of Computer / IT centre • Design and Development Team • Reporting Team • Testing/ debugging/ Staging / Deployment Team • Hardware and Networking Team • Documentation Team • Benchmarking and Standardization of all activities • Applications Development Activities • Hardware and Networking Infrastructure • Software Maintenance Activities • Hardware • High-end Blade Servers with Blade enclosure and FC-FC pass-through (Application /DB/ Replication/ Web/ Staging/ FTP) • Multifunctional Device • High rating online UPS • DG Set (for problematic areas) • SAN Storage (depending upon size of database)

  6. State level • Disaster Recovery Site (in a different city/state) • Connectivity • Leased Line (NICNET/ SWAN)/ VSAT • Manpower • DBA • Network Admin • HW expert • Documentation in charge/ technical writer • Analysts/ programmers • Software • Licensed OS (say Windows 2008) • Licensed RDBMS (say SQL Server 2008 or above) • Office Automation Suite (MS Office 2010 pro) • AVS

  7. Capacity Building • E-Governance Lifecycle training • Training on BPR • Training on OB and Change Management • Training on Contract Management • NISG may be roped in • At least 2-3 training programs/ seminars/ workshop every year at various levels

  8. Some more Suggestions • Strengthening of Election Machinery at all levels with dedicated officers/ officials: • Addl./ Jt. /Dy. CEO • Section Officer • Assistants (UDC/ LDC) • Peons • Dedicated BLOs (other than teachers) • Mobile Phone SIM to be provided to BLOs • GPS hand-held devices for PSL mapping • CUG network for CEO/DEO/ERO/AERO • Online Discussion Forum (using Collaboration Tools)

  9. Thanks

More Related