Group VICT Infrastructure Requirements Saleem Khan Additional SIO, NIC J&K
ERO Level • Hardware • Desktop Computers, Laser Printers, Scanners • UPS, DG Set (for problematic areas) • Digital Camera, Android Phone • Connectivity • Leased Line (NICNET/ SWAN) / VPNoBB • Router / Switch/ Cables/ IO Boxes • Manpower • Office Asstt./ Data Entry Operators (data entry/ reports/ EPIC/ Complaint handling) • Software • Office Automation Suite (MS Office 2010 pro) • AVS
DEO Level • Hardware • Desktop Computers, Laser Printers, Scanners • UPS, DG Set (for problematic areas) • Android based Phone • Connectivity • Leased Line (NICNET/ SWAN)/ VSAT • Router / Switch/ Cables/ IO Boxes • Video-Conferencing setup • Manpower • Assistant Programmers • Data Entry Operators (data entry/ reports/ EPIC) • Software • Office Automation Suite (MS Office 2010 pro) • AVS
CEO Level • Hardware • Desktop Computers, • Multifunctional Devices • UPS, DG Set (for problematic areas) • Android based Phone • Connectivity • Leased Line (NICNET/ SWAN)/ VSAT • Router / Switch/ Cables/ IO Boxes • Video-Conferencing setup • Manpower • IT Manager • Systems Analyst • Programmers • Data Entry Operators (data entry/ reports/ EPIC) • Software • Office Automation Suite (MS Office 2010 pro) • AVS
State Level • Setting up of Computer / IT centre • Design and Development Team • Reporting Team • Testing/ debugging/ Staging / Deployment Team • Hardware and Networking Team • Documentation Team • Benchmarking and Standardization of all activities • Applications Development Activities • Hardware and Networking Infrastructure • Software Maintenance Activities • Hardware • High-end Blade Servers with Blade enclosure and FC-FC pass-through (Application /DB/ Replication/ Web/ Staging/ FTP) • Multifunctional Device • High rating online UPS • DG Set (for problematic areas) • SAN Storage (depending upon size of database)
State level • Disaster Recovery Site (in a different city/state) • Connectivity • Leased Line (NICNET/ SWAN)/ VSAT • Manpower • DBA • Network Admin • HW expert • Documentation in charge/ technical writer • Analysts/ programmers • Software • Licensed OS (say Windows 2008) • Licensed RDBMS (say SQL Server 2008 or above) • Office Automation Suite (MS Office 2010 pro) • AVS
Capacity Building • E-Governance Lifecycle training • Training on BPR • Training on OB and Change Management • Training on Contract Management • NISG may be roped in • At least 2-3 training programs/ seminars/ workshop every year at various levels
Some more Suggestions • Strengthening of Election Machinery at all levels with dedicated officers/ officials: • Addl./ Jt. /Dy. CEO • Section Officer • Assistants (UDC/ LDC) • Peons • Dedicated BLOs (other than teachers) • Mobile Phone SIM to be provided to BLOs • GPS hand-held devices for PSL mapping • CUG network for CEO/DEO/ERO/AERO • Online Discussion Forum (using Collaboration Tools)