1 / 18

Proposed School Calendar 2007-2008

This is the proposed school calendar for the academic year 2007-2008, addressing various issues such as instructional days, professional growth days, holidays, and childcare services. Includes recommendations for acceptance and discontinuation of certain services.

rothrock
Download Presentation

Proposed School Calendar 2007-2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2007-2008 Proposed School Calendar

  2. Calendar Committee Dianne Baker Teresa Bentley Anita Bolt Dana Fleming Sue Hughes Brian Johnson Kathy Kennedy John Shook Harvey Tackett Jan Tackett

  3. Issues to Address • HB 380- add 2 instructional days to the calendar for 187 days/1062 hours • CSIP due in November-Test scores released in late September • KTIP needs 140 instructional days before May 1 • Growth day at the beginning of the 2nd semester • MLK day Jan. 21 • 3 Full weeks before testing after spring break • Need a Growth day before testing to do training • Portfolio scoring in May-need 2 PG Days

  4. 2007-2008 Calendar • 165 Instructional Days • 1113.75 Hours • Bank 51.75 Hours/7.67 days • 12 Professional Growth days • 4 Holidays • 158 instructional days for KTIP • 86 Instructional days 1st semester; 79 2nd semester

  5. Opening Day PD Growth Day First day for students 20 Instructional Days

  6. Labor Day 19 Instructional Days

  7. 3 Growth days 2 Out of the calendar days 18 Instructional Days

  8. PD Election Day 1 Growth Day H 3 Out of the calendar days 1 Holiday 16 Instructional Days

  9. PD 20 6 Out of the calendar days 1 Holiday 31 13 Instructional Days

  10. PD 7 1 Out of the calendar day 1 Holiday 2 Growth Days 16 Instructional Days

  11. 2 Growth Days 2 Out of the calendar days 17 Instructional Days

  12. SPRING BREAK 16 Instructional Days

  13. 1 Growth Day Assessment Window 21 Instructional Days

  14. 2 Growth Days Last day for students Closing Day 31 7 Instructional Days

  15. 2007-2008 Calendar • 165 Instructional Days • 1113.75 Hours • Bank 51.75 Hours/7.67 days • 12 Professional Growth days • 4 Holidays • 158 instructional days for KTIP • 86 Instructional days 1st semester; 79 2nd semester

  16. Childcare Service • Model we “adopted” (Webster County) only provided the child-care service for one year. • We have for both years. The attendance has ranged from 2 to 6 students throughout the course of the year.

  17. 3 Recommendations: • Accept the calendar as presented • Include Bank Time as presented • Discontinue the Child Care service

More Related