1 / 5

Scope 18km of sewers (500mm to 3000mm dia) 2 lift stations

Sewerage Schemes to serve Developments in Jurong Eastern Catchment and Jurong Lake District. Objective Extend sewers to serve new developments & phase out 4 pumping stations. Scope 18km of sewers (500mm to 3000mm dia) 2 lift stations

rowena
Download Presentation

Scope 18km of sewers (500mm to 3000mm dia) 2 lift stations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sewerage Schemes to serve Developments inJurong Eastern Catchment and Jurong Lake District Objective • Extend sewers to serve new developments & phase out 4 pumping stations Scope • 18km of sewers (500mm to 3000mm dia) • 2 lift stations • Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International Road pumping stations • Grouting of 18km of twin pumping mains(660mm to 950mm dia)

  2. Sewerage Schemes to serve Developments inJurong Eastern Catchment and Jurong Lake District

  3. Sewerage Schemes to serve Developments inJurong Lake District Expected Calling Date – December 2010 • Package A – Proposed Sewers along Yuan Ching Road • 500mm dia sewer – 1.2km • 900mm dia sewer – 1.3km • Package B (Contract 1) – Proposed Lift Station at Jurong Town Hall Road • 300 l/s capacity lift station • Expected Calling Date – January 2011 • Package B (Contract 2) – Proposed Sewers along Jurong Town Hall Road • 300mm dia sewer – 750m • 500mm dia sewer – 1.5km • 900mm dia sewer – 700m

  4. Sewerage Schemes to serve Developments inJurong Eastern Catchment Expected Calling Date – February 2011 • Package A (Contract 1) – Proposed Sewers along Pioneer Road and Jalan Ahmad Ibrahim • 3000mm dia sewer – 3.1km • Package B – Proposed Sewers along Jalan Boon Lay • 3000mm dia sewer – 3.2km • Expected Calling Date – March 2011 • Package A (Contract 2) – Proposed Sewers along Jurong West Avenue 2 • 2500mm dia sewer – 2.5km

  5. Sewerage Schemes to serve Developments inJurong Eastern Catchment Expected Calling Date – April 2011 • Package C (Contract 1) – Proposed Lift Station at Jurong Water Reclamation Plant • 164,000 cmd capacity lift station • Expected Calling Date – May 2011 • Package C (Contract 2) – Proposed Sewers along Jalan Tukang and International Road • 2000mm dia sewer – 1.9km

More Related