170 likes | 190 Views
This document discusses the safety plan for the installation readiness review, including design safety issues, the safety team and coverage, safety training, job hazard analysis, tailgate safety meetings, safety coordination, and management safety walkthroughs.
E N D
LST SAFETY INSTALLATION READINESS REVIEW 5/5/2004 FRANK O’NEILL (SLAC)
SAFETY ISSUES • Safety Plan • Design Safety Issues • FHA Addendum • Environmental/Emissions
SAFETY PLAN • October 2003, Review Committee - Recommendation #3 “Third is the need for more formal safety planning. The circumstances of the installation in 2004 and 2005 present a significant risk of accident. Early, detailed, safety planning is needed to ensure adequate personnel training and full-time coverage by safety officers on all shifts for the duration of the installation. With appropriate advance planning, training, and staffing, the work can be conducted safely.”
SAFETY PLAN • Safety Team and Coverage • Safety Training • Job Hazard Analysis • Tailgate Safety Meetings • Safety on agenda for Daily Operations Meetings • Safety Coordination - Fire Safety, Security, OHP, PRCS, ETC. • Management Safety Walkthroughs
SAFETY TEAM • Team Leader is Sandy Pearson • Members include Frank O’Neill and Joe Kenny - Four additional team members are needed for the day and swing shifts • Candidates have been identified • Time commitment is two 8 hour shifts per week • BaBar Operators will be considered for Graveyard shift safety coverage
SAFETY TRAINING • Accident Prevention Talk & Walk • IR-2 Safety Briefings will be conducted every day the first week • IR-2 Safety Briefings will be conducted weekly thereafter - Wednesday at 1:30 at IR-2 Cornelius - and as required
JOB HAZARD ANALYSIS • Rigging Procedures and Job Hazard Analysis (JHA) have been completed for special purpose handling fixtures • Safety Review of these procedures and JHA has been accomplished
TAILGATE SAFETY MEETINGS • Will be conducted at the start of each shift and as necessary at the beginning of new activity and operations • Review of the JHA with the crews is an essential part of the tailgate safety meeting
DAILY OPERATIONS MEETINGS • Safety on Agenda at Daily Operations Meetings • A Safety Team Member will attend and communicate safety issues and concerns
SAFETY COORDINATION • Fire Safety • Security • OHP • PRCS
MANAGEMENT SAFETY WALKTHROUGHS • This is under consideration
DESIGN SAFETY ISSUES • Flammable Component of Gas Mixture • Electrical/Electronics Final Design
GAS MIXTURE • 3 components: Argon, Isobutane, and CO2 • Similar Gas Mixtures utilized on other Detectors • SLD: 2.5% Ar, 9.5% isobutane, 88% CO2 • ZEUS: 3% Ar, 8% isobutane, 89% CO2 • Final decision on mixture pending • Nonflammable mixture will be utilized • Hughes Associates providing consulting services for evaluation of mixtures
GAS MIXTURE STATUS • Hughes Associates Inc. reviewed and approved the gas system proposal • Fire Protection Safety Committee review completed April 6, 2004 • Hazardous Experimental Equipment Committee (HEEC) review completed April 12, 2004 – final walkthrough before start-up is required
FIRE HAZARD ANALYSIS (FHA) ADDENDUM • Hughes Associates Inc. is currently working on the second Addendum to the FHA • Recently received a description of the LST Electrical/Electronics – an issue to be addressed is do we need to provide VESDA coverage • Ed Budnick has committed to delivering the Addendum by the end of June • Submit to the DOE for Information Only
ENVIRONMENTAL SAFETY • Bay Area Air Quality Management District (BAAQMD) issues SLAC a permit for discharge of VOCs • BaBar emissions may approach the limits of the permit • Monitoring the emission levels and coordination with the SLAC Environmental Protection Department is ongoing