1 / 5

Review on FR2 testability issue

This document provides an update on the testability issue related to Frequency Range 2 (FR2) in the 3GPP TSG-RAN5 Meeting #84. It includes observations, contributions, and references to address the issue. The deadline for uploading contributions is November 8th.

rstradley
Download Presentation

Review on FR2 testability issue

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3GPP TSG-RAN5 Meeting #84 R5-19xxxx Ljubljana, Slovenia, 26th Aug 2019 - 30th Aug 2019 Agenda Item : 5.3.5.17 Document for : Information Review on FR2 testability issue NTT DOCOMO, INC.

  2. Status of testability issue • Contributions about FR2 testability issue can be summarized as below. • Observations • ACLR SNR estimation will be required again if RAN4 core requirement is updated during this meeting. • There are 3 contributions about MOP (SC), and all contributions conclude “No relaxation is required”. • Testability issue is newly raised in following TCs which is not listed in LS from RAN Plenary. • OBW, In-band blocking, General Spurious

  3. Comparison of 3GPP with Regulatory body (ARIB) • Observations • Some estimations (highlighted in RED) don’t satisfy acceptable value from ARIB. • It seems that ACLR (relative requirement) is the most critical case since required relaxation much exceeds acceptable value. • NOTE 1 : Required relaxation value depends on “Antenna array assumption” and “test points (MPR)”.

  4. Time plan • In order to complete RAN5 work in time (Nov-2019), it is beneficial to receive reply LSs before RAN5#85. • ARIB : Reply LS is already received in [12]. • FCC : Status? • ETSI : Status? • Questions • If RAN5 (RAN P) doesn’t receive reply LS before RAN5#85, • RAN5 will conclude this topic according to reply LSs which is available then. • RAN5 will not conclude this topic until all the reply LSs are available. (RAN5 work will be delayed.) • When is enough to receive reply LS to prepare RAN5 contributions for Nov meeting? • Deadline for upload is “8th, Nov”.

  5. References [1] R5-193104 : SNR estimation update for FR2 priority 1 and 2 TRx TCs, Anritsu, RAN5#NR5 [2] R5-196572 : Impact of noise for FR2 ACLR, Anritsu, RAN5#84 [3] R5-196589 : Testability of FR2 ACS and IBB, Anritsu, RAN5#84 [4] R5-196573 : Impact of noise for FR2 OBW, Anritsu, RAN5#84 [5] R5-196852 : On the SNR for FR2 TRx test cases, ROHDE & SCHWARZ, RAN5#84 [6] R5-196853 : Discussion on testability of ACS and IBB, ROHDE & SCHWARZ, RAN5#84 [7] R5-196868 : On noise impact, Keysight Technologies UK Ltd, RAN5#84 [8] R5-196869 : FR2 OBW measurement uncertainty, Keysight Technologies UK Ltd, RAN5#84 [9] R5-196870 : Discussion paper on FR2 ACS and IIB, Keysight Technologies UK Ltd, RAN5#84 [10] R5-196871 : FR2 Tx spherical coverage noise impact, Keysight Technologies UK Ltd, RAN5#84 [11] R5-196872 : FR2 ACLR noise impact, Keysight Technologies UK Ltd, RAN5#84 [12] R5-196960 : Reply LS on 5G-NR FR2 Transmitter & Receiver Testability Issues, ARIB, RAN5#84 [13] RP-191603 : 5G-NR FR2 Transmitter & Receiver Testability Issues, TSG RAN, RAN#84

More Related