An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JJ JamiesonMIC Chair MIC Report for ISAS August 2013 Salt Lake City

  2. MIC Goals • Proposed MIC Goals for 2013 – 2014 • Several new items have been added for MIC consideration • Primary focus on reliability and commercial impacts • Goals have been posted for comment until the end of the month • Discussed WECC bifurcation and the need to review the MIC organizational structure going forward • Support the WECC bifurcation activities • Review the Market Interface Committee organizational structure and make changes as deemed necessary based on industry evolution • Provide subject matter expertise to the WECC Members Advisory Committee (MAC), the RCCO MAC, the WECC Board of Directors (BOD), and the RCCO BOD on both an as-requested and on a self-initiated basis

  3. Taskforce Updates • Energy Product Codes Report • MIC members discussed the draft INT-018-WECC-RBP-1 • The document contains a number of terms that require definition • The group discussed the proposed language for the definition of WR3.1 G-F: Firm Energy • The MIC was unable to reach agreement on what should be included in the definition of Firm Energy • The document will be posted for comment until the end of August. • Enhanced Curtailment Calculator Advisory Committee (ECCAC) • The ECC Cost Benefit Analysis which has been presented to the Finance and Audit Committee (FAC). • The FAC is evaluating inclusion of the ECC tool in the 2014 WECC budget. WECC currently uses webSAS for congestion management. • The WECC RC in conjunction with the ECCAC have identified four deficiencies in the current webSAS program including: • lack of real-time transmission topology • failure to account for non-tagged uses of the transmission system • lack of real-time generation outage topology • lack of POR/POD granularity for e-Tag evaluation • The cost per year has been estimated for each of these deficiencies • The total costs are estimated at $1,230,898 annually

  4. Taskforce Updates (2) • Unscheduled Flow Accounting Subcommittee (UFAS) • There has been a decrease in Unscheduled Flow Events in 2013 compared to last year • UFAS will be doing an evaluation of 2012 events on Path 30 similar to the evaluation that was done for Path 66 • UFAS is looking at a new methodology for dues calculations in hopes of simplifying the process. • Reliability Based Control (RBC) Task Force • White paper has been posted • Open discussion on the RBC findings and Data issues encountered • VGS Operating Reserve Task Force • The group is in the process of analyzing the benefits and tradeoffs of different operating reserve calculation methods • The Department of Energy has provided funding for NREL to perform the study • Discussed the FESTIV tool (Flexible Energy Scheduling Tool for Integration of Variable Generation) • MIC is following this effort to understand the commercial impacts

  5. Reports and Other Activity • Panel Discussion on EIM efforts within the WECC footprint • Commissioner Travis Kavulla gave an update on the Public Utility Commission (PUC) EIM Group • Jim Price gave an overview of CAISO and PacifiCorp (PAC) EIM efforts • Scott Kinney discussed some of the results of the NWPP EIM analysis

  6. General Updates • Gas-Electric Coordination Updates • FERC is looking at each region to determine what level of coordination is taking place between the gas and electric industries • Discussions have taken place regarding coordinating the scheduling practices of the two industries • A WECC Gas-Electric Coordination meeting will be scheduled for later in the year. • Data Sharing Update • WECC staff have been working with RPIC to review WECC data sharing policies • The group is interested in making certain types of data (maps, base cases, projected demand and energy data, and operating information) more readily available • Currently, many types of data are only available to WECC members, but non-members also need access • MIC members discussed the possibility of sharing historical transmission data as well as the need to balance open access to data with legal considerations

  7. Upcoming Meetings MIC Meetings: • Week of October 21, 2013, Anaheim MIS and SIS Joint Meeting: • Oct 10, 2013, Salt Lake City

  8. JJ Jamieson MIC Chair 503 970 8422 Questions?