An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IHEP Site Status Report IHEPCCC Meeting Gang Chen June 28, 2007

  2. Requirements at IHEP • LHC: Tier-2 • to support ATLAS and CMS. • BEPC: BES-III • Start to take data in the end of 2007 • 5 PB totally in next 5 years • 2000 kSpecInt2K • YBJ-ARGO Cosmic Ray Observatories • 240 TB/year • 400 kSpecInt2k • 155 Mbps dedicated link from Tibet to Beijing • DayaBay Neutrino Experiment • 20 TB disk, 150-600 TB tape • 100 kSpecInt2k up to 2009 • 155 Mbps dedicated link • Synchrotron Radiation Applications • …. Gang Chen/CC/IHEP 2014/9/16 - 2

  3. CPU and Disk • ~500 CPU/cores installed. • 1U rack mounted and IBM blades • Shared by experiments • Heavily loaded • ~100 TB disk space • Most are SATA • Directly attached to servers • New resources will be purchased in the year Gang Chen/CC/IHEP 2014/9/16 - 3

  4. Mass Storage • IBM TS3584 tape library • one base frame + one exp. Frame initially • 4 LTO drives • To be expanded to full configuration next year or later • CASTOR 1.7 deployed on a test bed, with a ADIC tape library • Moving to CASTOR 2 for the production system Gang Chen/CC/IHEP 2014/9/16 - 4

  5. Implementation • Operating System: SLC 3.08 currently • Going to SLC 4 • Computing resource management • Batch system: Torque/LSF, • Monitoring: Ganglia • login service: load-balanced interactive farm • Automated installation: Quattor • Storage management • Home dir.: AFS • Data dir.: NFS/RFIO • Mass storage system: CASTOR Gang Chen/CC/IHEP 2014/9/16 - 5

  6. Networking (1) • Gloriad: China-US-Europe • Too Big RTT: 350 ms • ~5MB/s, multi-stream transfer between CC-IN2P3 and IHEP Gang Chen/CC/IHEP 2014/9/16 - 6

  7. Networking (2) • ORIENT/TEIN2: China-Europe • Better RTT: 170 ms • 16-26MB/s, multi-stream transfer between CC-IN2P and IHEP • Switched to TEIN2 last week! • Network is being improved, better performance is needed 2.5Gbps Gang Chen/CC/IHEP 2014/9/16 - 7

  8. Infrastructure (1) • 450 m2 computing room refurbished in 2006 • New Cooling • New Power Supply: 0.5 MW • New UPS Gang Chen/CC/IHEP 2014/9/16 - 8

  9. Infrastructure (2) • Computing Room Gang Chen/CC/IHEP 2014/9/16 - 9

  10. Infrastructure (3) • Part of power supply and UPS Gang Chen/CC/IHEP 2014/9/16 - 10

  11. Tier-2 • A site to support ATLAS and CMS • CE: Computing Element • SE: Storage Element • FTS: File Transfer Service • LFC : LCG File Catalog • VOMS: VO Membership Service • Resources Very Limited • funding not yet fully secured • Discussing with MoST and NSFC, Gang Chen/CC/IHEP 2014/9/16 - 11

  12. Planned Resources For LHC, BES, etc. Gang Chen/CC/IHEP 2014/9/16 - 12

  13. Summary • A lot of things to be done for funding • Have to work with MoST and NSFC • Better global network is needed. • Voice from international community, like IHEPCCC, could help to push things forward. Gang Chen/CC/IHEP 2014/9/16 - 13