1 / 4

Project Location: 35th Ave HSIP8

Project Location: 35th Ave HSIP8. Project Name: HSIP8 – 35th Ave (from East 12 th St to I-580). Background Aims to make corridor safer for pedestrians and all users through corridor-wide crossing enhancements Community requests

ryann
Download Presentation

Project Location: 35th Ave HSIP8

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Location: 35th Ave HSIP8 Project Name: HSIP8 – 35th Ave (from East 12th St to I-580) Background • Aims to make corridor safer for pedestrians and all users through corridor-wide crossing enhancements • Community requests • Senior safety area, pedestrian high-injury intersection, high pedestrian demand • Class II bicycle lanes • Posted speed 25 MPH, critical speed 32 MPH (85th percentile) • Improve movement of goods and people to spur economic development and growth Location • Land use: residential/commercial • Transportation and access issues: pedestrians/bicyclists • Issues: unsafe vehicular speed, traffic conflicts with pedestrians/bicyclists • Parallel corridor to two major freeways (I-580 and I-880) 2018 Lead Division Name: TRAFFIC CAPITAL PROJECTS StreetMap

  2. Project Location: 35th Ave (Cont.) PED – Improvement for pedestrians BIKE – Improvement for bicyclists VEH – Improvement for Vehicle BUS – Improvement for Transits Work Plan 2018 Lead Division Name: TRAFFIC CAPITAL PROJECTS PED – Improvement for pedestrians BIKE – Improvement for bicyclists VEH – Improvement for Vehicle • Project Timeline • Start date [1/2018] • Phases that have been completed : PE Authorization in progress • Construction Completion planned for [5/2021] Improvements • Install Rectangular Rapid Flashing Beacons • Install or upgrade crosswalk • Install High Intensity Activated Crosswalk Beacon • Install pedestrian countdown devices • Upgraded traffic signal mast arm and controllers • Left turn signal phase • Reallocation of road space Benefits • Alerts oncoming traffic of pedestrian crossing • Safer pedestrian crossing • Efficient traffic flow through use of upgraded signal arm Traffic Signals • Control speeding, making right of way clearer and reduce ambiguity • Combine collision-reduction benefits of HAWKs and RRFB’s Classification • Protected left turn phase at Foothill Boulevard • Class II bicycle lanes between International and East 12th St Budget • Total Project Cost: $2,903,800.00 Scope • Install new or enhanced crosswalks at 11 locations • Install 3 HAWK signals • Install 7 RRFB’s • Upgrade Signals- Traffic Control • Buffered bicycle lane

  3. Project Location: 35th Ave (Cont.) Existing Conditions Photo – 35th Ave and E 12th St (Foothill Blvd) 2018 Proposed Conditions Photo – 35th Ave and E 12th St (Foothill Blvd) Lead Division Name: TRAFFIC CAPITAL PROJECTS

  4. Project Location: 35th Ave (Cont.) 2018 Lead Division Name: TRAFFIC CAPITAL PROJECTS

More Related