1 / 36

Team AquaForce

Team AquaForce. F. aqua. Team Members: Santos Ortiz (TL) Christopher Munoz Vicente Mora. Instructor: Raresh Pascali Industry Advisor: Garrett Hohmann Faculty Advisor: www.TeamAquaForce.com. Outline. Competition Product Selection Process Component Breakdown Design Intent

sabin
Download Presentation

Team AquaForce

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team AquaForce F aqua • Team Members: • Santos Ortiz (TL) • Christopher Munoz • Vicente Mora Instructor: RareshPascali Industry Advisor: Garrett Hohmann Faculty Advisor: www.TeamAquaForce.com

  2. Outline • Competition • Product Selection Process • Component Breakdown • Design Intent • Cost Analysis • Gantt Chart • Work Break-down Structure (WBS) • Risk Matrix

  3. 2014 MATE ROV COMPETITION • Mission Scenario • Location: Northwestern Lake Huron, Thunder Bay. • More than 50 shipwrecks within the Thunder Bay National Marine Sanctuary (TBNMS). • Scientist and conservation groups are needed. Map of the Great Lakes with Thunder Bay Map of Thunder Bay, highlighting the TBNMS and its shipwrecks

  4. 2014 MATE ROV COMPETITION • Mission Tasks • Explore, document, and identify an unknown shipwreck. • Collect microbial samples and measure conductivity of the groundwater emerging from a sinkhole. • Remove trash and debris from the shipwreck and surrounding area. Zebra mussels engulf a shipwreck Side and top view of ROV scanning shipwreck

  5. 2014 MATE ROV COMPETITION Mission Props • Outsource • Materials list provided • Instructions provided

  6. Competition • Product Selection Process • ROV Design Breakdown • Design Intent • Cost Analysis • Gantt Chart • Work Break-down Structure (WBS) • Risk Matrix

  7. Product Selection Process • Cost efficient • Thrust capacity • Compatibility

  8. Product Selection Process • Size • Cost efficient • Waterproof

  9. Product Selection Process • Cost efficient • Weight • Machinability

  10. Product Selection Process • Compatibility • Voltage capacity • Cost efficient

  11. Product Selection Process • Cost efficient • Modifiable • Competition • advantage

  12. Competition • Product Selection Process • ROV Design Breakdown • Design Intent • Cost Analysis • Gantt Chart • Work Break-down Structure (WBS) • Risk Matrix

  13. ROV Design Breakdown

  14. ROV Design Breakdown

  15. ROV Design Breakdown Ballast Housing • P = 100 psi • Tensile strength of acrylic = 10,587 psi • Actual pressure at pool bottom =27 psi

  16. ROV Design Breakdown Tether and Connector

  17. Competition • Product Selection Process • ROV Design Breakdown • Design Intent • Cost Analysis • Gantt Chart • Work Break-down Structure (WBS) • Risk Matrix

  18. Design Intent • The surface area of the plates provides the ROV with the need to remove material to satisfy weight standards if needed. • Side slots allow for cross elements to be easily adjusted. • Buoyancy: • Bulk Modulus:

  19. Design Iterations • Depth control • Maneuverability • Mission design intent

  20. Design Calculations Variables and Constants

  21. Design Intent

  22. Design Intent

  23. Design Intent Communication Flowchart

  24. Design Intent Hydraulic Schematic

  25. Competition • Product Selection Process • ROV Design Breakdown • Design Intent • Cost Analysis • Gantt Chart • Work Break-down Structure (WBS) • Risk Matrix

  26. Cost Analysis

  27. Competition • Product Selection Process • ROV Design Breakdown • Design Intent • Cost Analysis • Gantt Chart • Work Break-down Structure (WBS) • Risk Matrix

  28. Gantt Chart

  29. Competition • Product Selection Process • ROV Design Breakdown • Design Intent • Cost Analysis • Gantt Chart • Work Break-down Structure (WBS) • Risk Matrix

  30. Work Breakdown Structure

  31. Competition • Product Selection Process • ROV Design Breakdown • Design Intent • Cost Analysis • Gantt Chart • Work Break-down Structure (WBS) • Risk Matrix

  32. Risk Matrix

  33. Lessons Learned • Manage your cost! • Funding and design should be simultaneously managed. • Mitigating high cost. • Switching material sizes. • Teamwork! • - Communicate and divide the project into portions. • - Make sure everyone knows everyone else's job. • Organization • Maintain to do lists between team members. • Meet deadlines placed on each other.

  34. Future Outlook • Attend OTC • Reach out and educate a local high school • Begin manufacturing and assembly this month!

  35. Thanks to our Sponsors! Pending:

  36. Questions???

More Related