1 / 29

Transrapid Maglev System

Transrapid Maglev System. Comparison of Systems Railroad / Maglev. Titel. Wheel-on-rail. Electromagnetic Levitation. Guidance. Propulsion. Propulsion. Support. Support. System Components. Electromagnetic Levitation. Stator Pack. Guidance Magnet Eddy Current Brake. Support Magnet

sabin
Download Presentation

Transrapid Maglev System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transrapid Maglev System

  2. Comparison of Systems Railroad / Maglev Titel Wheel-on-rail Electromagnetic Levitation Guidance Propulsion Propulsion Support Support

  3. System Components Electromagnetic Levitation Stator Pack Guidance Magnet Eddy Current Brake Support Magnet Linear Generator Guidance Rail

  4. Linear Motor

  5. Magnetic Traveling Field Propulsion Principle

  6. Longstator Propulsion Switching Activated Motor Section Motor Section Switched Off Motor Section Switched Off Energy Supply

  7. Comparison Propulsion Systems Transrapid (Track-mounted drive) Gradient (max. 10%) Railroad (Vehicle-mounted drive) Gradient (max. 4%)

  8. Transrapid/ICE Acceleration distance to 300 km/h (185 mph)

  9. Transrapid Acceleration of a 6-section vehicle 256,3 s 22,7 km 147,5 s 9,1 km 97,1 s 4,2 km 61,1 s 1,7 km km/h 500 400 300 200 100 0 s 0 50 100 150 200 250 300

  10. At-grade Guideway 6,2 m 1,25 -3,5 m 4,4 - 5,1 m Elevated Guideway 62 m (50 m / 25 m) 2,2 -20 m 4,4 - 5,1 m 31 m (25 m / 12,5 m) Guideway Types

  11. Guideway Bending Switch Turn-out Direction 3,60 m 150 m Straight Direction

  12. Transrapid 08

  13. Transrapid Applications Regional Networks Airport link City Connections Medium & Long distance

  14. Flughafenanbinder: 2 Sectionen with up to 184 Seats Langstrecke: Up to 10 Sections with 1172 Seats Trainset Configurations

  15. Cargo Vehicle

  16. Safety

  17. (m2/m) 14 ICE 12 TR at grade 2 TR elevated Land Consumption

  18. Transrapid Collocation with highways TR Standard 26.4.2001

  19. Wh/seat-km (under identical conditions) cannot be achieved by ICE 3 Transrapid Transrapid Transrapid ICE ICE 200 km/h 125 mph 300 km/h 185 mph 400 km/h 250 mph Specific Energy Consumption

  20. Values in grams per seat-km 190 60 33 30 23 Short-haul Flight Transrapid Transrapid Car ICE 400 km/h 250 mph 300 km/h 185 mph Specific CO2 Emissions

  21. Pass-by Level in dB(A) at a Distance of 25 m (82 ft) 92 90 89 85 82 80 80 73 Suburban Train Transrapid 07 Transrapid 07 Transrapid 07 ICE 1+2 TGV-A ICE 1+2 TGV-A 80 km/h 50 mph 200 km/h 125 mph 400 km/h 250 mph 300 km/h 185 mph Noise Emission

  22. in µTesla Earth‘s Magnetic Field Transrapid Color TV Hair Dryer Electric Stove Magnetic Field Strength

  23. Track Investment Costs ICE/Transrapid Long Distance Application ICE ICE ICE Transrapid ICE PlanningBerlinHamburg HannoverWürzburg CologneFrankfurt HannoverBerlin MannheimStuttgart level, few tunnels, 94 mi, Price level 1997 low-mountains, many tunnels, 205 mi, Price level 1988 low-mountains many tunnels, 62 mi, Price level 1988 low-mountains many tunnels, 118 mi, Price level 1998 level, few tunnels, 181 mi, Price level 1998 New route including track infrastructure, operation/maintenance facilities, without trains and station New route including guideway infrastructure, operation/maintenance facilities, without vehicles and stations (Berlin-Hamburg Project planning) (in million DM per double track km)

  24. Pfennigs per seat-km(under identical conditions) Vehicle Guideway Overall System 100% 100% 34% 100% 29% 41% Operating Speed: ICE = 250 km/h (155 mph) Transrapid (TR) = 450 km/h (280 mph) Overall System Maintenance Costs Long Distance Application

  25. Emsland Test Facility TVE Guideway Length: 31.5 km / 19.5 miles North Loop South Loop High-speed Section (400-450 km/h) Observation Point Switch Switch Switch At-grade Guideway At-grade Guideway Visitor / Test Center

  26. Shanghai Airport Link Route

  27. Shanghai Airport Link Project Data Route Length 30 km double track Link to maintenance facilities 3 km single track Stations 2 Number of vehicles in 2003 3 vehicles each with 5 sections (6 sections from June 2004) Traffic Volume • in 2005 10 million passengers • in 2010 20 million passengers • in 2020 33 million passengers Travel speed (max.) 430 km/h Trip time 8 minutes Headway 10 minutes (option: 5 minutes) Daily operation 18 hours

  28. Munich Airport Link

  29. Metrorapid NRW

More Related