390 likes | 614 Views
Transrapid Maglev System Innovative traintechnology. Comparison of Systems Railroad / Maglev. Titel. Wheel-on-rail. Electromagnetic Levitation. Guidance. Propulsion. Propulsion. Support. Support. System Components. Electromagnetic Levitation. Stator Pack. Guidance Magnet
E N D
Transrapid Maglev System Innovative traintechnology
Comparison of Systems Railroad / Maglev Titel Wheel-on-rail Electromagnetic Levitation Guidance Propulsion Propulsion Support Support
System Components Electromagnetic Levitation Stator Pack Guidance Magnet Eddy Current Brake Support Magnet Linear Generator Guidance Rail
Magnetic Traveling Field Propulsion Principle
Longstator Propulsion Switching Activated Motor Section Motor Section Switched Off Motor Section Switched Off Energy Supply
Comparison Propulsion Systems Transrapid (Track-mounted drive) Gradient (max. 10%) Railroad (Vehicle-mounted drive) Gradient (max. 4%)
Transrapid/ICE Acceleration distance to 300 km/h (185 mph)
Transrapid Acceleration of a 6-section vehicle 256,3 s 22,7 km 147,5 s 9,1 km 97,1 s 4,2 km 61,1 s 1,7 km km/h 500 400 300 200 100 0 s 0 50 100 150 200 250 300
25 m Guideway Types At-grade guideway Typ III 1,25-3,5 m Elevated guideway Typ II 49,536 m Elevated guideway Type I
Guideway Bending Switch Turn-out Direction 3,60 m 150 m Straight Direction
Airport Link: 2 Sections with up to 184 Seats Long distance: Up to 10 Sections with 1172 Seats Trainset Configurations
(m2/m) 14 ICE 12 TR at grade 2 TR elevated Land Consumption
Transrapid Collocation with highways TR Standard 26.4.2001
Wh/seat-km (under identical conditions) cannot be achieved by ICE 3 Transrapid Transrapid Transrapid ICE ICE 200 km/h 125 mph 300 km/h 185 mph 400 km/h 250 mph Specific Energy Consumption
Values in grams per seat-km 190 60 33 30 23 Short-haul Flight Transrapid Transrapid Car ICE 400 km/h 250 mph 300 km/h 185 mph Specific CO2 Emissions
Pass-by Level in dB(A) at a Distance of 25 m (82 ft) 92 90 89 85 82 80 80 73 Suburban Train Transrapid 07 Transrapid 07 Transrapid 07 ICE 1+2 TGV-A ICE 1+2 TGV-A 80 km/h 50 mph 200 km/h 125 mph 400 km/h 250 mph 300 km/h 185 mph Noise Emission
in µTesla Earth‘s Magnetic Field Transrapid Color TV Hair Dryer Electric Stove Magnetic Field Strength
Track Investment Costs ICE/Transrapid Long Distance Application ICE (in million € per double track km) ICE ICE Transrapid ICE HannoverWürzburg CologneFrankfurt HannoverBerlin MannheimStuttgart BerlinHamburg level, few tunnels, 94 mi, Price level 1997 low-mountains, many tunnels, 205 mi, Price level 1988 low-mountains many tunnels, 62 mi, Price level 1988 low-mountains many tunnels, 118 mi, Price level 1998 level, few tunnels, 181 mi, Price level 1998 New route including track infrastructure, operation/maintenance facilities, without trains and station New route including guideway infrastructure, operation/maintenance facilities, without vehicles and stations (Berlin-Hamburg Project planning)
Overall System Maintenance Costs Long Distance Application Eurocent per seat-km (under identical conditions) Vehicle Guideway Overall System 100% 100% 34% 100% 29% 41% Operating Speed: ICE = 250 km/h (155 mph) Transrapid (TR) = 450 km/h (280 mph)
Emsland Test Facility TVE Guideway Length: 31.5 km / 19.5 miles North Loop South Loop High-speed Section (400-450 km/h) Observation Point Switch Switch Switch At-grade Guideway At-grade Guideway Visitor / Test Center
Shanghai Airport Link Route
Shanghai Airport Link Project Data Route Length 30 km double track Link to maintenance facilities 3 km single track Stations 2 Number of vehicles in 2003 3 vehicles each with 5 sections Traffic Volume • in 2005 10 million passengers • in 2010 20 million passengers • in 2020 33 million passengers Travel speed (max.) 430 km/h Trip time 8 minutes Headway 10 minutes (option: 5 minutes) Daily operation 18 hours
Munich Airport Link Western Route Possible tunnel Airport Neufahrn b. Fsg. Eching Unterschleißheim Oberschleißheim AB.-Dreieck Feldmoching Ismaning Olympiapark Main Station Messe Ostbahnhof
Munich Airport Link Project Data Munich Airport – Central Station Number of vehicles Sections / Vehicle Seats per vehicle including seats Stations Traffic Volume Travel speed (average speed) Trip Time Train schedule 5 3 148 148 2 7.86 million passengers/year 350 km/h / 218 mph (220 km/h / 137 mph) 10 minutes every 10 minutes
Munich Airport Link Track Data Munich Airport – Central Station Route length in collocation with federal highways in collocation with roads/railways Track length elevated (> 6m above GUE*) at grade (> 2m above GUE*) at grade (1,45 m above GUE*) within tunnel * GUE = Ground Upper Edge 37.4 km / 23.2 miles 18.7 km / 11.6 miles (50%) 2.9 km / 1.8 miles (8%) 37.4 km / 23.2 miles 5.25 km / 3.3 miles (14%) 12.7 km / 7.9 miles (34 %) 19.45 km / 12.1 miles (52%) 7.2 km / 4.5 miles (19%)
Pittsburgh International Airport to Greensburg Route length 86.9 km / 54 miles Vehicles 8 (3 sections each) Stations 5 Invest cost $ 3.5 billion Trip time 35 minutes Pennsylvania ProjectRoute Alternatives Pittsburgh International Airport Magport North Shore Magport Pittsburgh Monroeville Magport Station Square Magport Monongahela Greensburg Magport
Baltimore-Washington ProjectRoute Alternatives 795 Baltimore to Washington D.C. Route length 62.8 km / 39 miles Stations 3 Trip time 18.5 minutes Vehicles 7 (3 sections each) Invest cost $ 3.7 billion Baltimore 32 295 95 Washington D.C.
From Las Vegas to Primm Route length 56 km / 35 miles Stations2 Trip time 11 minutes Vehicles 3 (8 sections each) Investment cost $ 1.3 billion Nevada Las Vegas California Primm Barstow Los Angeles TransrapidLas Vegas
TransrapidProject Netherlands Amsterdam Schiphol – Groningen (Zuiderzeelijn) Route length 186 km / 116 miles Stations 8 Trip time 59 minutes Groningen Drachten NORTH SEA Heerenveen NETHERLANDS Emmeloord Lelystad Amsterdam Almere Schiphol International Airport