1 / 19

Reorganizing COE June 17, 2003

Reorganizing COE June 17, 2003. Overview of Reorganization Plan. Slides 1-3 Introduction 4-8 COE Strategic Charge 9-17 Attributes of Proposed Units 18-25 Criteria for Forming New Units 26-31 Specifics for Forming a New Unit – Note output expected by 1 Sept. 32 -34 The Launch.

sade-snyder
Download Presentation

Reorganizing COE June 17, 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reorganizing COEJune 17, 2003

  2. Overview of Reorganization Plan • Slides 1-3 Introduction • 4-8 COE Strategic Charge • 9-17 Attributes of Proposed Units • 18-25 Criteria for Forming New Units • 26-31 Specifics for Forming a New Unit – Note output expected by 1 Sept. • 32 -34 The Launch

  3. Quick Review of Slides 26 - 31

  4. New Organizational Units • Basic Engineering • Applied Engineering • Cross-Cutting Engineering • General Engineering & Research • Institute(s) • Special Committees and Business Units 8

  5. Attributes • Agile & Flexible – be able to change and reconfigure itself over time • Simplicity – mission should be easy to understand and adopt • Build on Existing Strengths – should not re-organize units that form the basis of strength for ASME, but utilize these units as examples on how to succeed, build new areas of strength and attract new members • Utilize Overall Vision of ASME • Transparency and Accountability – should foster entrepreneurial operations that are transparent and accountable • Set mutually agreed upon goals and a time table to achieve with interim metrics to assess and permit mid-course corrections 9

  6. Roadmap – How Do We Select a Unit? • The core strength for each division is their knowledge base(s) and active volunteers • The division must support the active volunteer • The active volunteer is one of the customers of the division • The division must take steps to attract other members and customers • The VPs (unit or institute) have fiduciary responsibility for the success of their divisions/institutes • Each division should know who their customers are • There are different types of customers, • Different levels of relationship with the customers • Just as there are different types of knowledge bases • The integration between the knowledge bases and the customer must be improved 10

  7. The Units Have Many Customers • Other Divisions within COE • Council on Codes & Standards • Council on Member Affairs (Regions & Sections) • Council on Education • Council on Public Affairs • Other Societies • Government Agencies • The Public • Industry • Academia • The fundamental identity of the active volunteer is through their division or even the technical committee 11

  8. Implementation Schedule • The VP will meet with each division’s leadership • Preferably one on one, face to face for an extended period of time • The VP will explain the expectations and metrics stemming from the COE's efforts • Initial feedback on type of unit decision needed by September • The division chair will organize a meeting and prepare an agenda • The division chair will obtain the information from their VP regarding the suggested roadmap, metrics and expectations 12

  9. Division Meeting – Select a Unit • What is this meeting intended to produce? • Summarize results of the Congress of Divisions, TEC, and COE • Summarize the finances of the division - expected revenues and costs will be distributed • Emphasize the need for the division to act strategically 13

  10. How to Select a Unit • Discuss • The roadmap • Meeting ASME expectations • Growing the division • Definitions should be explained such as basic engineering unit, applied engineering unit, cross cutting unit, general engineering and research unit, and institute • A vote will be taken by the executive committee to declare in which unit the division sees itself • The division will list which other divisions match up with each knowledge base of the division. • The division executive committee will use the strategic plan to decide which other divisions to consolidate or cooperate with in producing products 14

  11. Next Step – Update Vision • The division will upgrade their strategic plan • The division strategic plan should contain a statement of what the knowledge base(s) of the division are • What the products of the division are • Who the customers are along with a description of the type of relationship with each customer • Re-evaluate metrics 15

  12. What is Our Plan? • The division will produce a business plan • This plan will show how the knowledge base of the division is matrixed into the customers and products • This plan will have a schedule and budget estimate that includes all revenues and expenditures (including staff overheads) • The division will measure its working relationship with staff • What were the expectations? • What was the actual performance? • The division will measure its contribution to emerging technology subjects 16

  13. From Here • Divisions need consult the membership and set a schedule for a first draft of the New Unit Plan • Give decision to me by 1 Sept (some slack?) • Info conveyed to COE and BOG • Decisions on reorganization by SAM 2004. • Questions to me at 979-693-9301, Cell 979-492-9534 or email debray@brayengr.com • Or to Rich Ulvila at 212-591-7863 or email ulvilar@asme.org.

  14. Whom do you represent? • Present active members • Present inactive members • Former members – those who dropped in last 5 years • New ME graduates, potential members.

  15. This is good!