1 / 9

Old Dominion Electric Cooperative Meter Estimation Project

Old Dominion Electric Cooperative Meter Estimation Project. Daryl Jaschen Director of MIS Old Dominion Electric Cooperative. Background. ODEC has 218 delivery points through which power is delivered to 12 member cooperatives.

sahkyo
Download Presentation

Old Dominion Electric Cooperative Meter Estimation Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Old Dominion Electric Cooperative Meter Estimation Project Daryl Jaschen Director of MIS Old Dominion Electric Cooperative

  2. Background • ODEC has 218 delivery points through which power is delivered to 12 member cooperatives. • The transmission service providers are Dominion Virginia Power, Connectiv, APCO, and Philadelphia Electric.

  3. Background (cont.) • There are six weather stations (Richmond, Washington D.C., Dulles, Norfolk, Dover, Wilmington) which ODEC’s receive hourly readings of temperature, dew point, wind direction, wind speed, and cloud coverage. • Currently, of the 218 delivery points, all but 30 have direct mappings (by common name from Member’s SCADA system) into the ODEC’s SCADA database.

  4. Background (cont.) • Data is transferred to ODEC via a LiveData ICCP node that connects ODEC to all 12 members. • ODEC is a co-owner of ACES Power Marketing. • ACES performs bulk power marketing services for ODEC.

  5. Deregulation – the Source of Change in the Industry • Deregulation led to a termination of all requirements contract in Virginia. • The penalties associated with the new network service agreement drew attention to the need for more reliable hourly load forecasts.

  6. The Problem • In order to avoid bulk power related scheduling penalties, an accurate hourly load consumption value for all 218 delivery points had to be provided to ACES on an hourly basis.

  7. ODEC’s Solution • ODEC and ACES initiated a rigorous requirements definition process. • A specification was written and sent to 4 vendors. • After a vendor evaluation, RER (now Itron) was selected to design, install, and bring on-line a Meter Estimation and Validation System.

  8. The Schedule • The spec went out in July 2002 • The vendor was chosen in August 2002 • The system was designed, installed, tested, and brought on-line January 1, 2003.

  9. A Successful Project • Found errors in the data coming from members • Types of errors included: • The MVES is stable and runs reliably • The forecast errors are approximately

More Related