180 likes | 278 Views
Introduction. A brief look at the summer non-coincident peak demand and the resources available to meet the demandBased on data filed on the Electricity Resource Planning Form S-1Municipal utilities larger than 200 MW add up to more than 90% of the muni loadImperial Irrigation District's resource
E N D