PCB production . Next steps. MMSW. PCBs (1.2 x 0.5 m 2 ) were ordered at Eltos Delivery confirmed for middle of next week (from Eltos ) Foils with resistive strips 8 foils with sputtering have been delivered by A. Ochi

sakina
Download Presentation

PCB production

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PCB production Next steps J. Wotschack

  2. MMSW • PCBs (1.2 x 0.5 m2) were ordered at Eltos • Delivery confirmed for middle of next week (from Eltos) • Foils with resistive strips • 8 foils with sputtering have been delivered by A. Ochi • 8 foils with strips by screen printing to be done at Charbonney (Meyrin) • Will try to measure all foils before glueing • Glueing of resistive foils to PCBs to be done at CERN • Pillar deposition at CERN • Hope to have first set of completed PCBs ready end of November/begin December • Panel glueing: safer to plan for beginning of January J. Wotschack

  3. NSW MMs Next step: test the glueing procedures and pillar deposition for large-size PCBs (2.3 x 0.5 m2).No need to make operational boards, processes can be tested with dummy boards and foils (saves cost & time) • Material procurement • PCBs: MDT (Italy); Elvia; Eltos; Triangle Lab; others • Kapton foils (procurement either through CERN or companies) • Glueing • MDT (Italy) + others (?) – Large press • Elvia (France) + others (?) – Autoclave • Triangle Lab ? • Pillar deposition • Eltos;Elvia; Triangle lab; others ? • CERN (Rui de Oliveira) will prepare specifications • Schedule: expect results by end of January (?) • Questions: • who is interested to be involved (Saclay, Frascati, others ?) • How to finance this step (moderate costs)? J. Wotschack