Time-Cost Evaluation

Time-Cost Evaluation. Actual (Actual Cost of Work Completed). Earned Value (EV) (Budgeted Cost of Work Completed). Planned Value (PV) (Budgeted Cost of Work Scheduled). Cost. 0. Time. Schedule Variance SV = EV – PV Positive SV Means Early Negative SV means Late. Cost Variance

sakura
Download Presentation

Time-Cost Evaluation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Time-Cost Evaluation Actual(Actual Cost of Work Completed) Earned Value (EV)(Budgeted Cost of Work Completed) Planned Value (PV)(Budgeted Cost of Work Scheduled) Cost 0 Time • Schedule Variance SV = EV – PV Positive SV Means Early Negative SV means Late • Cost Variance CV = EV – Actual Positive CV Means Under Budget Negative CV means Over Budget

  2. Examples • Example 1 PV = $100, EV = $105, Actual = $95 • Example 2 PV = $100, EV = $80, Actual = $95 • Project is ______ worth of work __________ schedule • and ___________ budget. $5 ahead of $10 under • Project is ______ worth of work __________ schedule • and ___________ budget. $20 behind $15 over

  3. Time-Cost Evaluation How much is the project ahead of schedule? $8000 – $7900 = $100 or $100 / $7900 = 1.3% early How much is the project above the budget? $8000 – $7500 = $500 or $500 / $8000 = 6.25% under budget

  4. Sigma capability measures how many std.dev. the process mean is away from the closer tolerance limit Process Capability – Sigma Capability z1 z2 UTL LTL

  5. Process Capability Index Suppose the control limits are X  3. If Cpk<1, then an “in-control” process might produce defects. • LTL = 70, UTL = 90, X = 80,  = 2.5 Cpk = _______ • What if X shift to 84? Cpk = _______ 1.333 0.8

  6. Improving Process Capability σ = 5 σ =10 LTL LTL UTL UTL σ =10 σ = 5 LTL LTL UTL UTL

  7. Know The Enemy: 7 Types of Muda • Overproduction • Defects • Inventory (> need) • Waiting (of workers and products) • Processing (non adding value) • Motion (> minimum required) • Handling (> minimum required)

  8. TPS Goal, Assumptions, Principles • Goal: Eliminate Waste (Muda) • TPS is a production system that is steeped in the philosophy of the complete elimination of all waste imbuing all aspects of production in pursuit of the most efficient methods. (www.toyota.co.jp/en/vision/production_system) • Assumptions: • Plan (in advance) <> Need (in real-time) • Problems will happen • Principles: • Just-In-Time (JIT) • Make problems visible, act immediately when they occur

  9. Economic Order Quantity (EOQ) Model • Data: D = Demand rate (units / yr) C = Cost of purchasing or producing a unit ($ / unit) S = Setup cost or per order or per production run ($) H = Annual holding cost per unit of inventory ($ / (unit•yr)) H is often taken as a percentage of the unit cost: H = i C, where i is annual percentage holding cost • Decision: Q = Quantity of an order (units) • Objective: To minimize the total cost Let’s see how to compute the total cost …

  10. Finding the Optimal Q (EOQ) Cost Lowest Cost Holding cost Ordering Cost QOPT (optimal order quantity) Q

  11. Total Cost Inventory Slope = D (units/year) Number of orders per year = Annual ordering cost = Average inventory = Annual holding cost = Annual purchase cost = Q Time D / Q( / yr) (D / Q)  S($ / yr) Q / 2(units) (Q / 2)  H($ / yr) C  D($ / yr)