Ian Bird Overview Board; CERN, 8 th March 2013. Update of Computing & Software Models. Background. Requested by the LHCC in December: need to see updated computing models before Run 2 starts A single document to: Describe changes since the original TDRs (2005) in

sally
Download Presentation

Update of Computing & Software Models

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ian Bird Overview Board; CERN, 8th March 2013 Update of Computing & Software Models Ian.Bird@cern.ch

  2. Background Ian.Bird@cern.ch • Requested by the LHCC in December: need to see updated computing models before Run 2 starts • A single document to: • Describe changes since the original TDRs (2005) in • Assumptions, models, technology, etc. • Emphasise what is being done to adapt to new technologies, to improve efficiency, to be able to adapt to new architectures, etc. • Describe work that still needs to be done • Use common formats, tables, assumptions, etc • 1 document rather than 5

  3. Timescales Ian.Bird@cern.ch • Document should describe the period from LS1 – LS2 • Estimates of evolving resource needs • In order to prepare for 2015, a good draft needs to be available in time for the Autumn 2013 RRB, so needs to be discussed at the LHCC in September: • Solid draft by end of summer 2013 (!) • Work has started • Informed by all of the existing work from the last 2 years (Technical Evolution groups, Concurrency forum, Technology review of 2012)

  4. Opportunities Ian.Bird@cern.ch • This document gives a framework to: • Describe significant changes and improvements already made • Stress commonalities between experiments – and drive strongly in that direction • Significant willingness to do this • Describe the models in a common way – calling out differences • Make a statement about the needs of WLCG in the next 5 years (technical, infrastructure, resources) • Potentially review the organisational structure of the collaboration • Review the implementation: scale, quality of service of sites/Tiers; archiving vs processing vs analysis activities • Raise concerns: • E.g. staffing issues; missing skills;

  5. Draft ToC Ian.Bird@cern.ch Preamble/introduction Experiment computing models Technology review and outlook Challenges – the problem being addressed Distributed computing Computing services Software activities and strategies Resource needs and expected evolution Collaboration organisation and management

  6. Experiment computing models Ian.Bird@cern.ch Data models – types of data, event sizes, relationships, etc Anticipated event rates and data streams Data flows Differences for Pb-Pb or p-Pb Non-event data

  7. Technology review Ian.Bird@cern.ch • Use (update) report from 2012 • What are likely technologies in next 5 years? • CPU: e.g. Intel vs ARM vs GPU vs ?? • Storage • Clouds/virtualisation • Likely evolution of networks • Etc.

  8. Challenges Ian.Bird@cern.ch • What problem are we addressing? • Need to make the best use possible of available resources • Major investment in software needed • But missing skills, people, tools, infrastructure? • Need for flexibility in adapting the models to changing technologies • …

  9. Distributed computing Ian.Bird@cern.ch • Use Cases • Calibration, reconstruction, re-processing, stripping, analysis use cases & strategies for prompt vs delayed analysis, simulation • Functions implemented at Tier 0,1,2, HLT • Include how we would use opportunistic resources • Review functions: perhaps distinguish between archive needs and data distribution needs, QoS • Networking • What will our needs be? • What topologies to interconnect tiers?

  10. Computing services Ian.Bird@cern.ch • Emphasise commonalities between experiments (and justify differences) • Workflow management – use of pilots, implementations, needs at sites • Data management – strategies for use of tapes, disks, other storage; services such as FTS, data popularity, data federation • Use of HEP vs standard protocols • Distributed computing services (aka “grid mw”) • Describe the services required, central vs distributed deployments; where do experiment needs diverge? • Federated identity management? • Infrastructure services: operations, monitoring, accounting, security, etc • Other new technologies

  11. Application Software Ian.Bird@cern.ch Current and recent activities – gains already achieved Strategies for the future How to address the use of new architectures etc Common tools and libraries (ROOT, GEANT, etc) Possibility for common frameworks between experiments, prerequisite for: Setting up consultancy/optimisation team (inc. testing infrastructure) to guide efforts in optimisation (memory use, I/O, parallel code, etc) What is the coordination and management needed for this?

  12. Resource Needs & Evolution Ian.Bird@cern.ch • Assumptions on running conditions • Event parameters • Summary tables of resource requirements • Tape, disk, cpu, bandwidths • 2015-2018/19

  13. Collaboration Organisation & Management Ian.Bird@cern.ch Opportunity to review the WLCG organisational structure and associated bodies Stress the need for building collaborative activities – in order to find the effort for needed developments, operations, etc. Describe the anticipated interactions with e-infrastructures (EGI/Horizon 2020, OSG, etc) Interaction with other HEP experiments – i.e. should the scope of WLCG broaden to support HEP more widely?