An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRR of SCT off-detector cooling system • Cooling System • Design - Off-cylinder & On-cylinder • Installation – Off-cylinder & On-Cylinder • Manufacture – On-cylinder only • Assembly – On-cylinder only • Post assembly operations – On-cylinder only • Schedule – On-cylinder only CCLRC

  2. PRR of SCT off-detector cooling system • Design • Off-Cylinder • On-Cylinder CCLRC

  3. PRR of SCT off-detector cooling system • Design • Off-Cylinder • HEX / filter • Heater • On-Cylinder • Inlet • Exhaust • Combined CCLRC

  4. PRR of SCT off-detector cooling system • Design • Inlet – with fluid flow • SERTO @ PPF1 • 5mm OD / 3.4mm ID with filter • 3mm OD / 2mm ID through HEX • ECcap3 custom connection @ STFT • Capillaries • LMT cooling circuit (combined) – or – PPF0 @ Disc CCLRC

  5. PRR of SCT off-detector cooling system • Design – Inlet… • SERTO @ PPF1 • 6mm OD – 5mm OD • SERTO issues • 316 Magnetic? (Danielsson / Olcese) • Swagelock issues • Not survive many connection / disconnection • May need retightening after time • 5mm OD / 3.4mm ID with filter • Standard Cu tube 5mm OD 0.8mm wall • Joined over 3mm OD tube exiting the HEX (QMUL design) • Filter design • Screen • 0.5mm holes (264) > 5x 3.4mm ID of inlet tube • Capillary ID 0.68 or 0.76mm CCLRC

  6. PRR of SCT off-detector cooling system • Design – Inlet… • 5mm OD / 3.4mm ID with filter… CCLRC

  7. PRR of SCT off-detector cooling system To PPF1 • Design – Inlet… • 3mm OD / 2mm ID through HEX • CERN stores • Coiled through HEX • 8mm ID, 13.5mm OD (touching) • 4mm pitch, 84 coils • Effective length 2923mm (incl. 10mm each end to start coil) • ECcap3 custom connection @ STFT • Space, electrical isolation, soldering compatibility CCLRC

  8. PRR of SCT off-detector cooling system • Design – Inlet… • Capillaries • ID 0.68mm or 0.76mm • Length around 2.5m (tuned) • Coiled / convoluted routing on cylinder (TBD) • Joined to LMT Cooling circuit or PPF1 • LMT cooling circuit (combined) • 3.74mm OD 70um wall • Swaged-solder connection CCLRC

  9. PRR of SCT off-detector cooling system • Design – Inlet… • PPF0 • Based on Helicoflex • Already tested (I.Wilmut) • Only hole  changes from original design • 2 Types 1.3 & 1.25 nominal (0.76 & 0.68mm ID) CCLRC

  10. PRR of SCT off-detector cooling system • Design • Exhaust – with fluid flow • PPF0 @ Disc or LMT cooling • 6.0mm ID / 8.1mm ID tubing • ECex1 • HEX • ECheat1 custom connection • Heater • PPF1 CCLRC

  11. PRR of SCT off-detector cooling system • Design – Exhaust… • PPF0 @ Disc or LMT cooling • PPF0 • LMT Cooling CCLRC

  12. PRR of SCT off-detector cooling system • Design – Exhaust… • 6.0mm ID / 8.1mm ID tubing • 6.0mm ID • 0.2mm wall = 30mm bend R • 8.1mm ID • 0.15mm wall = straight lengths only • 4x8.4mm (+1.2mm gaps) = 37.2mm CCLRC

  13. PRR of SCT off-detector cooling system • Design – Exhaust… • ECex1 • Custom connection • HEX • 14mm ID 0.2mm wall CuNi • 370mm long body with end caps STFT CCLRC

  14. PRR of SCT off-detector cooling system • Design – Exhaust… • ECheat1 custom connection • Staggered connections • Insulation issues • Fastening issues • Cu – Stain.s CCLRC

  15. PRR of SCT off-detector cooling system • Design – Exhaust… • Heater • PPF1 • SERTO 6mm OD - 6mm OD CCLRC

  16. PRR of SCT off-detector cooling system • Design – Off-cylinder • HEX assemblies (no inlet / filter) complete • Iteration through QMUL practical experience (end-caps – soldering of ECcap3 & ECex1) • Higher level, 1 ‘sample’ for in-house tests, rest to do • Assembly of all HEX (new) for overall view • Parameter dwg to do? CCLRC

  17. PRR of SCT off-detector cooling system • Design – On-cylinder • Exhaust & LMT circuit design, PPF1 – STFT complete CCLRC

  18. PRR of SCT off-detector cooling system • Installation – On-cylinder – Assembly Sites (Liv. NIK.) • Combined (Exhaust / Inlet assembly) • D9-D7 before D9 or before D6 services laid (avoid layering) • Laid using support frame • STFT clip (await connection), PPF0 connected, LMT Kapton taped • Exhaust uses insert mounted clamp, Inlet clipped to exhaust, LMT wrapped with LMTs • Exhaust • D6 –D1 with relevant Disc • Laid by hand STFT clip (await connection), PPF0 connected • Exhaust uses Support Cylinder insert mounted clamp CCLRC

  19. PRR of SCT off-detector cooling system • Installation – On-cylinder – Assembly Sites (Liv. NIK.) • Inlet • D6-D1 with relevant Disc • Pre-formed coils • Laid by hand, supported above STFT, Kapton taped • Inlet clipped to exhaust CCLRC

  20. PRR of SCT off-detector cooling system • Installation – On-cylinder – Assembly Sites (Liv. NIK.) • Connection for Testing CCLRC

  21. PRR of SCT off-detector cooling system • Installation – Off-cylinder • Space required to ‘insert’ connection • Use R1116 envelope (post EC insertion) CCLRC

  22. PRR of SCT off-detector cooling system • Installation – Off-cylinder • Order of connection • Low Z to high Z • Special spanner Z+ Z- CCLRC

  23. PRR of SCT off-detector cooling system • Installation – Off-cylinder • Strain relief at STFT (ECex1) • Permanent • Adjustable • positions not guaranteed CCLRC

  24. PRR of SCT off-detector cooling system • Installation – Off-cylinder • Connection for Testing • STFT break & make + drying if cold testing • Compromise for maximum HEX length • Extension pieces connected in, STFT sealed once, testing, remove & integrate SCT EC into ATLAS, add interconnect to PPF1, seal & test seal CCLRC

  25. PRR of SCT off-detector cooling system • Manufacture – On-cylinder only • Piece Parts all detailed & out for manufacture with NTE (6 weeks from 24/03/05) • Attempting to get them to deliver those for D9 – D7 (including LMT cooling) ASAP CCLRC

  26. PRR of SCT off-detector cooling system • Assembly – On-cylinder only • Jig details out for quote • Jig to be used @ RAL for assembly of Interconnects, including LMT cooling CCLRC

  27. PRR of SCT off-detector cooling system • Post assembly operations – On-cylinder only • Clean circuits • Flushing with Swansolve • Pressure test • To 25 Bar • Leak test • 5x10-8 bar l/s (time / pressure test) • Check blockage • Simple flow test for circuits with capillaries (based on flow through Disc capillary for D9 – D7) • Bar code according to the ATLAS parts ID • With traveller document CCLRC

  28. PRR of SCT off-detector cooling system • Schedule – On-cylinder only • Interconnects • SB - Models / drawings for D9 - D7 including LMT cooling - 09/03/05 • JT - Check drawings - 10/03/05 • SB - Quote pack to go to NTE - 11/03/05 • NTE - Quote back - 16/03/05 • SB / OM raise order & release through OM - 17/03/05(actual 24/03/05) • NTE Manufacture - 6 Weeks(incl. Easter) - 28/04/05 • RAL Tech manufacture D9 (all 8 /2 types) incl.LMT cooling - 1 Week - 5/05/05 • RAL Tech manufacture D8 (all 8 /2 types) incl.LMT cooling - 1 Week - 12/05/05 • RAL Tech manufacture D7 (all 8 /2 types) incl.LMT cooling - 1 Week - 19/05/05 CCLRC

  29. PRR of SCT off-detector cooling system • Schedule • Jig • JT-Model Jig - 08/03/05 • Contractor detail jig - 2 Weeks - 22/03/05 • JT - Check drawings (incl. any changes) - 24/03/05 • JT -Quote pack to OM - 29/03/05 – Expected 01/04/05 (companies turning down!) • JT / OM raise order & release through OM - 29/03/05 • Manufacture 4 weeks - 26/04/05 CCLRC